Author: <span>Losada, Felix</span>

The story of the Nordex Group would be incomplete without a look at its service operations. In this issue, we revisit some of the key milestones in turbine maintenance and service over the past 40 years—from manually prepared Excel spreadsheets to AI-supported remote maintenance, from buckets and cranes to self-learning machines, and from a small […]

Read more

Hamburg, 15 May 2025. During a certificate handover ceremony, the Nordex Group was yesterday awarded with unified global certifications by DNV for the following management systems: Quality (ISO 9001), Occupational health and safety (ISO 45001), and Environmental (ISO 14001). Global certifications are essential in the wind industry, as they confirm compliance with internationally recognized standards […]

Read more

Hamburg, 7. April 2025. To ensure the proper development and continuous service life of wind turbines, the international standard IEC 61400 specifies technical requirements for the design of wind turbines. An independent certification body must confirm compliance with these standards. This also includes the comprehensive structural testing of rotor blades according to IEC 61400-23. This […]

Read more

With the Anniversary Newsletter Edition #3, today we look back on a decade that would become formative for today’s industry – the exciting ’90s. “Thinking big” and “size matters” were the driving forces in the wind industry in the ‘90s – and Nordex was no exception. The wind industry was starting to boom – and […]

Read more

Today, we take the time again to look back on 40 years of our exciting company development with our Anniversary Newsletter Edition #2. Just one year after Nordex was established 1985, the very first Nordex-branded turbine was installed in 1986: the N27. With its 250kW generator, it was the world’s most powerful turbine at that […]

Read more