Norway: First kWh produced at Øyfjellet

The installation of the Øyfjellet is progressing fast forward with around 75% of the turbine installation works completed. The wind farm will consist of 72 N149/5.X TS105. Nordex Group is pleased to announce that the 26th of August the first kWH was produced at the wind farm.