Author: <span>Losada, Felix</span>

Hamburg, 15 May 2025. During a certificate handover ceremony, the Nordex Group was yesterday awarded with unified global certifications by DNV for the following management systems: Quality (ISO 9001), Occupational health and safety (ISO 45001), and Environmental (ISO 14001). Global certifications are essential in the wind industry, as they confirm compliance with internationally recognized standards […]

Read more

Hamburg, 7. April 2025. To ensure the proper development and continuous service life of wind turbines, the international standard IEC 61400 specifies technical requirements for the design of wind turbines. An independent certification body must confirm compliance with these standards. This also includes the comprehensive structural testing of rotor blades according to IEC 61400-23. This […]

Read more

With the Anniversary Newsletter Edition #3, today we look back on a decade that would become formative for today’s industry – the exciting ’90s. “Thinking big” and “size matters” were the driving forces in the wind industry in the ‘90s – and Nordex was no exception. The wind industry was starting to boom – and […]

Read more

Today, we take the time again to look back on 40 years of our exciting company development with our Anniversary Newsletter Edition #2. Just one year after Nordex was established 1985, the very first Nordex-branded turbine was installed in 1986: the N27. With its 250kW generator, it was the world’s most powerful turbine at that […]

Read more

Hamburg, 25 September 2024. TÜV SÜD has issued the IECRE Provisional Type Certificate (P-TC) for the N175/6.X turbine and handed it over to the Nordex Group at WindEnergy Hamburg on 24th September 2024. By receiving the Provisional Type Certificate, the Nordex Group can already start series production of the N175/6.X while field tests are carried […]

Read more

On July 12th, the Nordex Group installed the world’s first N175/6.X turbine at the Bürgerwindpark Janneby (community wind farm) in Schleswig-Holstein, Germany. Hamburg, 16 July 2024. On July 12th, the Nordex Group installed the world’s first N175/6.X turbine at the Bürgerwindpark Janneby (community wind farm) in Schleswig-Holstein, Germany. With a rotor swept area of 24,053 […]

Read more