Nordex Group reaches new heights with its inhouse developed hybrid tower: The second N175/6.X has now been installed – for the first time with a hub height of 179 metres
Hamburg, 27. January 2025. On January 26, 2025, the Nordex Group installed a N175/6.X turbine for the first time on a self-developed concrete-steel tower with a hub height of 179 metres in Santow in Mecklenburg-Western Pomerania, Germany. The hybrid tower is an in-house design of the Nordex Group. The 119-metre-high concrete tower of the hybrid […]