Nordex commencing tower production in Piaui, Brazil
DGAP-News: Nordex SE / Key word(s): Real Estate 06.04.2018 / 15:33 Nordex commencing tower production in Piaui, Brazil Hamburg, 6 April 2018. The Nordex Group has opened a plant in the North Brazilian state of Brazil Piaui for the production of concrete towers. The plant is to produce the 65 towers required for the “Lagoa do Barro” wind farm, which Nordex will be installing in the near future. It marks one of the first major investments in this state’s wind power industry. Large parts of the plant were originally used at a former facility in the south of Brazil and transported in heavy-duty loads to Lagoa do Barro City in a good 300 trips. With this step, Nordex is able to optimize the construction costs of the wind farm and complete construction work with minimum environmental impact. “We also wanted to ensure that the local population directly benefits from the project. Tower production alone will provide work for some 300 people,” said David Lobo, Head of Sales Brazil, who is managing the project for the Nordex Group.
About the Nordex Group For more information, please contact: Nordex SE 06.04.2018 Dissemination of a Corporate News, transmitted by DGAP – a service of EQS Group AG. The DGAP Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases. |
Language: | English |
Company: | Nordex SE |
Erich-Schlesinger-Straße 50 | |
18059 Rostock | |
Germany | |
Phone: | +49 381 6663 3300 |
Fax: | +49 381 6663 3339 |
E-mail: | info@nordex-online.com |
Internet: | www.nordex-online.com |
ISIN: | DE000A0D6554 |
WKN: | A0D655 |
Indices: | TecDAX |
Listed: | Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange |
End of News | DGAP News Service |