DGAP-News: Nordex SE / Key word(s): Incoming Orders2015-09-21 / 08:55---------------------------------------------------------------------Hamburg, 21. September. Nordex has received the 15th order from its keyaccount, Falck Renewables. The manufacturer will supply ten N90/2500turbines for the Assel Valley wind farm near the south-west coast ofScotland. The supply schedule includes the turnkey construction of the windfarm, including the civil and electrical infrastructure works. FalckRenewables is an international project developer, which has now shown itsconfidence in Nordex as a partner for the 15th time. Ten of the jointprojects are situated in the UK the total capacity now contracted in the UKon a turnkey basis for Falck Renewables has increased to more than 260megawatts. Other projects already implemented from the partnership withthis developer are located in Italy and France.The Assel Valley wind farm is located to the south-east of Girvan in SouthAyrshire. The average wind speed at this site is around 9 m/s,corresponding to wind class IEC-1. The N90/2500 is a strong-wind turbine,especially designed for such conditions. In order to ensure that theturbines do not exceed the permissible tip height, Nordex is installingthem on 65-metre towers, which the company has developed especially for theUK wind market. Even with the lower tip height of 110 metres, this toughturbine with a rotor blade length of 45 metres and a rotor sweep of 6,362square metres obtains exceptional yields.Nordex has already started construction work on the Assel Valley wind farm,which is due to be handed over to the customer in October 2016. Followingcommissioning, Nordex will be in charge of servicing the turbines andassociated works for at least five years on the basis of a Premium servicecontract.About NordexAs one of the technological leaders in multi-megawatt wind power systems,Nordex is benefiting from the trend in favour of large-scale turbines. TheGeneration Gamma range comprises the N90/2500, N100/2500 and the N117/2400,which is one of the most efficient series turbines for non-coastal regions.To date, over 3,600 of these turbines have been produced. With GenerationDelta, Nordex is now offering the fourth generation of its provenmulti-megawatt platform (N100/3300, N117/3000, N131/3000). Nordex hasinstalled more than 6,000 turbines with an aggregate capacity of over10,000 MW all around the world. With exports accounting for around 70percent of its business, Nordex SE also plays a key role in internationalhigh-growth regions. The Company has offices and subsidiaries in 22countries around the world The Group currently has around 3,000 employeesaround the world.---------------------------------------------------------------------2015-09-21 Dissemination of a Corporate News, transmitted by DGAP - aservice of EQS Group AG.The issuer is solely responsible for the content of this announcement.The DGAP Distribution Services include Regulatory Announcements,Financial/Corporate News and Press Releases.Media archive at www.dgap-medientreff.de and www.dgap.de---------------------------------------------------------------------Language: English Company: Nordex SE Erich-Schlesinger-Straße 50 18059 Rostock Germany Phone: +49 381 6663 3300 Fax: +49 381 6663 3339 E-mail: info@nordex-online.com Internet: www.nordex-online.com ISIN: DE000A0D6554 WKN: A0D655 Indices: TecDAX Listed: Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart End of News DGAP News Service --------------------------------------------------------------------- 396007 2015-09-21