Nordex Group receives orders for 295 MW from EDF Renewables in South Africa

EQS-News: Nordex SE / Key word(s): Incoming Orders
Nordex Group receives orders for 295 MW from EDF Renewables in South Africa
09.04.2024 / 07:30 CET/CEST
The issuer is solely responsible for the content of this announcement.

Hamburg, 9 April 2024. End of March, EDF Renewables (South Africa) a subsidiary of EDF Renouveables and Electricité de France (EDF), placed orders with the Nordex Group for two wind energy projects in South Africa.

The Korosun 2 cluster, consisting of the Umsobomvu  and Hartebeesthoek projects, will comprise 50 N163/5.X turbines with a total capacity of 295 MW. The Nordex Group will also be responsible for the maintenance and servicing of the turbines for a period of 20 years.

The Korosun 2 cluster is being built on the border of the Eastern Cape and Northern Cape provinces. Construction has started and the wind farms will be commissioned in Q1 of 2026. Each wind farm will comprise 25 turbines with a capacity of 147.5 MW. The Nordex Group is installing the N163/5.X turbines on tubular steel towers with a hub height of 118 metres. 

Patxi Landa, CSO of the Nordex Group: “We are proud to support EDF Renewables and the expansion of wind energy in South Africa, with our N163 turbines and in so doing, contribute to reducing the country’s dependence on coal.”

About the Nordex Group
The Group has installed around 50 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 6.5 billion in 2023. The Company currently has more than 10,000 employees. The Group’s manufacturing network includes factories in Germany, Spain, Brazil, India, USA (mothballed) and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.

Contact person for press:
Nordex SE
Felix Losada
Telephone: +49 (0) 40 30030 1141
E-mail: flosada@nordex-online.com

Contact for investors:
Nordex SE
Felix Zander
Phone: +49 (0) 152 0902 4029
E-mail: fzander@nordex-online.com


09.04.2024 CET/CEST Dissemination of a Corporate News, transmitted by EQS News – a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


show this