Nordex SE: Nordex Group receives orders from Eksim for the N163/6.X covering more than 150 MW in Türkiye

EQS-News: Nordex SE / Key word(s): Incoming Orders
Nordex SE: Nordex Group receives orders from Eksim for the N163/6.X covering more than 150 MW in Türkiye
15.12.2022 / 07:30 CET/CEST
The issuer is solely responsible for the content of this announcement.

Hamburg, 15 December 2022. The Nordex Group has received orders from Eksim Yatirim Holding A.S. covering more than 150 MW for the extension of two wind farms in Türkiye. The Nordex Group is to supply a total of 22 of the N163/6.X turbines as part of the extension of the existing “Geyve” and “Silivri” wind farms. The two orders also include a Premium Service contract for a period of ten years.

In the province of Sakarya near to the Black Sea the «Geyve” wind farm with a current capacity of 50 MW is being extended by a further 98 MW using 14 N163/6.X turbines. The “Silivri” wind farm in the province of Istanbul in Turkey’s Marmara region currently has a rated capacity of 63 MW. The Nordex Group will be adding eight turbines in the 6.X MW class, bringing the total to 115 MW.

At the end of 2023 the N163/6.X-turbines at the Geyve wind farm and in 2024 those at the Silivri wind farm will feed clean electricity into the Turkish grid. In order to ensure a high level of availability for the turbines in the «Geyve» wind farm at low temperatures as well, for the first time in a project in Türkiye the Nordex Group will be fitting the rotor blades with the Advanced Anti-Icing system.

«The Nordex Group has been working closely together with  Eksim for years and the fact that they have again opted for our technology for their wind farms shows that they continue to have confidence in our long-standing partnership,» says Patxi Landa, CSO of the Nordex Group. And he adds: “By enlarging the wind farms we are rapidly further advancing the expansion of wind energy in Türkiye and strengthening our leading position in the market, with 3.5 GW installed capacity in the country”.

Eksim Yatirim Holding A.S. has been active in the wind energy business since early 2000 and operates eight wind farms in Türkiye with a total output of 464 MW. All wind farms are equipped exclusively with Nordex turbines. Eksim can draw on experience in the operation of several generations of turbines. Their wind farms include N90 N100, N117, N131 and N149 machines. In the past Eksim has always used the latest turbine generation when extending their wind farms. In “Geyve” and “Silivri” in future N163/6.X turbines will once again improve the yields at these two sites thanks to their optimised high-performance technology.

The Nordex Group – a profile
The Group has installed more than 41 GW of wind energy capacity in over 40 markets and in 2021 generated revenues of EUR 5.4 billion. The company currently employs a workforce of approx. 9,000. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.

Contact person for press:
Nordex SE
Felix Losada
Phone: +49 (0)40 / 300 30 – 1141
flosada@nordex-online.com

Contact for investors:
Nordex SE
Felix Zander
Phone: +49 152 0902 4029
fzander@nordex-online.com


15.12.2022 CET/CEST Dissemination of a Corporate News, transmitted by EQS News – a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


show this