Nordex awarded 101.4-MW project in Argentina
DGAP-News: Nordex SE / Key word(s): Incoming Orders 02.10.2017 / 09:48 Nordex awarded 101.4-MW project in Argentina Independent Power Producer Genneia ordering 26 N131/3900 turbines Hamburg, 2 October 2017. The Nordex Group has added a further chapter to its success story in Argentina with an order for 26 N131/3900 turbines for the “Pomona” wind farm. The contract will be executed on a full EPC basis, including civil and electrical engineering, procurement, construction and manufacturing, delivery and installation of the wind turbines. Preparations for construction will be commencing in 2017, after which the wind power systems will be installed in the beginning of 2019. In addition, a ten-year full operation and maintenance contract has also been signed. The customer is Independent Power Producer Genneia, which has significant experience thanks to numerous projects in Argentina. The wind farm will be installed in Pomona, Rio Negro, where mean wind speeds of 8.6 m/s are measured. With a tower height of 120 metres, the turbines will be able to make optimum use of these winds. Additional to Pomona, Nordex has previously received two contracts for a combined 148 MW under the firsts Argentinean tender in early 2017. The new order comes from the RenovAr 1.5 tender, awarded to the client in November 2016. About the Nordex Group The Group has installed wind power capacity of around 21 GW in over 25 markets, generating sales of EUR 3.4 billion in 2016. It currently has more than 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 – 4.5 MW class addressing the requirements of a wide range of markets.
About GENNEIA Genneia is the leading business providing sustainable energy solutions, based on the use of cutting-edge technology on thermal equipment, and main investor on renewable energy projects in Argentina. It is also the owner and operator of Rawson Wind Farm, with a capacity of 77 MW, and it is expanding this capacity on 24 MW. Moreover, it is expanding the wind farm Madryn (220 MW) and other projects awarded in tenders RenovAr 1 and 1.5: Chubut Norte (28.35 MW), Villalonga (50 MW) and Pomona (101.4 MW). Genneia is one of the leaders in the area, generating almost 550 MW of wind power. For more information, please contact: Nordex SE Alfredo Bernardi
02.10.2017 Dissemination of a Corporate News, transmitted by DGAP – a service of EQS Group AG. The DGAP Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases. |
Language: | English |
Company: | Nordex SE |
Erich-Schlesinger-Straße 50 | |
18059 Rostock | |
Germany | |
Phone: | +49 381 6663 3300 |
Fax: | +49 381 6663 3339 |
E-mail: | info@nordex-online.com |
Internet: | www.nordex-online.com |
ISIN: | DE000A0D6554 |
WKN: | A0D655 |
Indices: | TecDAX |
Listed: | Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange |
End of News | DGAP News Service |