{"id":8198,"date":"2020-01-08T06:30:12","date_gmt":"2020-01-08T06:30:12","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/"},"modified":"2023-04-24T11:26:13","modified_gmt":"2023-04-24T11:26:13","slug":"nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/","title":{"rendered":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<br \/><span class=\"news_top_date\">08.01.2020 \/ 07:30 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<div class=\"break-word news_main\">\n<p><b>&#8211; <\/b>Manufacturer to supply 44 turbines with minimal electromagnetic radiation<\/p>\n<p><b>Hamburg, 8th January 2020. <\/b>In addition to the already published European orders received end of 2019, in December the Nordex Group was awarded on top to those orders a contract to install the Dutch wind farm \u00ab\u00a0De Drentse Monden en Oostermoer\u00a0\u00bb (DMO) as well. The manufacturer will supply 44 N131\/3900 turbines including the foundations with a capacity of 171.6 MW to its customers Duurzame Energieproductie Exloermond BV, Raedthuys DDM B.V. and Windpark Oostermoer Exploitatie B.V.. Together these three projects form the \u00ab\u00a0DMO (De Drentse Monden en Oostermoer)\u00a0\u00bb wind farm. Nordex will also be providing service for all these turbines after installation on the basis of a Premium Service contract for a period of 25 years. The turbine delivery and installation will start from the second half of 2020.<\/p>\n<p>The \u00ab\u00a0DMO\u00a0\u00bb wind farm is located to the south-east of Groningen, in the province of Drenthe near Exloo in the immediate vicinity of the central antenna field of the \u00ab\u00a0Low-Frequency Array\u00a0\u00bb (LOFAR). LOFAR, which is run by ASTRON, the Dutch Institute for Radio Astronomy, is a Europe-wide network of thousand highly sensitive radio antennas. It is used in the world&rsquo;s largest array of antennas for research into the universe.<\/p>\n<p>The antennas are very sensitive to electromagnetic radiation. Like every other electrical device, a wind turbine emits a certain amount of electromagnetic radiation. The highest permitted levels of this radiation are regulated by law. All wind turbines from the Nordex Group easily meet the required standard.<\/p>\n<p>The 172 MW order was awarded on condition that the emission level of electromagnetic radiation would be reduced to a predefined absolute minimum. In order to ensure that this could be done, the Nordex Group developed a predefined, extremely low-radiation version of the N131 turbine and installed the test turbine on site in the summer of 2019. ASTRON was able to confirm the very low electromagnetic radiation on site in a highly complex measuring procedure using the LOFAR antennas and their own technology. This meant that the order for the other 44 N131\/3900 turbines could be placed in December 2019. The Nordex Group booked receipt of the order for the test turbine in 2018. In its final form the \u00ab\u00a0DMO\u00a0\u00bb wind farm will comprise 45 turbines with a total of 175.5 MW.<\/p>\n<p>\u00ab\u00a0We are pleased to have been awarded the contract for this challenging project. At the customer&rsquo;s request we have successfully implemented a new technological solution. Now we can offer our N131 turbines for other projects with similarly demanding requirements regarding minimal electromagnetic radiation,\u00a0\u00bb says Patxi Landa, CSO of the Nordex Group.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>The Group has installed more than 27 GW of wind energy capacity in over 40 markets and in 2018 generated revenues of around EUR 2.5 billion. The company has more than 6,000 employees. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><br \/>Nordex SE<br \/>Felix Losada<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>Nordex SE<br \/>Felix Zander<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\" target=\"_blank\" rel=\"noopener noreferrer\">fzander@nordex-online.com<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">08.01.2020  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" class=\"first_column column_1\" nowrap>Language:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Company:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Phone:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Fax:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>E-mail:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Internet:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>ISIN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>WKN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Indices:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">Listed:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">948129<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">End of News<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders08.01.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; Manufacturer to supply 44 turbines with minimal electromagnetic radiation Hamburg, 8th January 2020. In addition to the already published European orders received end of 2019, in December the Nordex Group was awarded on [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-8198","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders08.01.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; Manufacturer to supply 44 turbines with minimal electromagnetic radiation Hamburg, 8th January 2020. In addition to the already published European orders received end of 2019, in December the Nordex Group was awarded on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-08T06:30:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:26:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands\",\"datePublished\":\"2020-01-08T06:30:12+00:00\",\"dateModified\":\"2023-04-24T11:26:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\"},\"wordCount\":665,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\",\"name\":\"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2020-01-08T06:30:12+00:00\",\"dateModified\":\"2023-04-24T11:26:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage\",\"url\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders08.01.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; Manufacturer to supply 44 turbines with minimal electromagnetic radiation Hamburg, 8th January 2020. In addition to the already published European orders received end of 2019, in December the Nordex Group was awarded on [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/","og_site_name":"Nordex SE","article_published_time":"2020-01-08T06:30:12+00:00","article_modified_time":"2023-04-24T11:26:13+00:00","og_image":[{"url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands","datePublished":"2020-01-08T06:30:12+00:00","dateModified":"2023-04-24T11:26:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/"},"wordCount":665,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/","url":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/","name":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data","datePublished":"2020-01-08T06:30:12+00:00","dateModified":"2023-04-24T11:26:13+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#primaryimage","url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=948129&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/01\/nordex-se-nordex-group-receives-three-new-orders-totalling-172-mw-from-the-netherlands\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group receives three new orders totalling 172 MW from the Netherlands"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/8198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=8198"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/8198\/revisions"}],"predecessor-version":[{"id":13083,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/8198\/revisions\/13083"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=8198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=8198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=8198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}