{"id":5176,"date":"2014-11-26T07:55:19","date_gmt":"2014-11-26T07:55:19","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/"},"modified":"2023-04-24T11:28:57","modified_gmt":"2023-04-24T11:28:57","slug":"nordex-to-build-large-scale-project-in-usa","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/","title":{"rendered":"Nordex to build large-scale project in USA"},"content":{"rendered":"<table class=\"news_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td><\/p>\n<p>Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p>26.11.2014 \/ 08:55<\/p>\n<hr>\n<div class=\"break-word\">\n<p><b>Press release<\/b><\/p>\n<p><b>Nordex to build large-scale project in USA <\/b><br \/>Contract awarded for the delivery of 43 N100\/2500 turbines for the \u00ab\u00a0Thunder Spirit\u00a0\u00bb wind farm<\/p>\n<p><b>Hamburg, 26 November 2014.<\/b> Nordex SE has been awarded a contract for the delivery of 43 N100\/2500 turbines plus a service contract for a period of at least five years. The \u00ab\u00a0Thunder Spirit\u00a0\u00bb project has already qualified under the applicable production tax credit system and has signed a power purchase agreement with a regional utility.<\/p>\n<p>The wind farm is located in Adams County in North Dakota, United States. This location is characterized by strong winds with a mean annual wind speed of nine metres per second in tandem with low turbulence. Given these favourable conditions, the 43 turbines will be able to generate an annual yield of up to 426 GWh, equivalent to an above-average capacity factor of more than 45 percent. At the same time, the wind farm will be able to supply over 39,000 local homes with electricity.<\/p>\n<p>The project was originally developed by Wind Works Power Corporation who has since sold its shares in the project entity to ALLETE Clean Energy (ACE), a subsidiary of ALLETE, Inc. ACE will construct the project and ultimately sell it under contract to Montana Dakota Utilities, a utility headquartered in Bismarck, ND.  Work on the wind farm infrastructure has already commenced. Nordex will be delivering the first few turbines to the construction site in mid-August 2015 with towers commencing end of July 2015. The wind farm is scheduled to be connected to the grid and to go on line in December 2015. <\/p>\n<p><b>About Nordex<\/b><br \/>As one of the technological leaders in multi-megawatt wind power systems, Nordex is benefiting from the trend in favour of large-scale turbines. The Generation Gamma range comprises the N90\/2500, N100\/2500 and the N117\/2400, which is one of the most efficient series turbines for non-coastal regions. To date, over 2,600 of these turbines have been produced. With Generation Delta, Nordex is now offering the fourth generation of its proven multi-megawatt platform (N100\/3300, N117\/3000, N131\/3000). Nordex has installed more than 6,000 turbines with an aggregate capacity of over 10,000 MW all around the world. With exports accounting for around 70 percent of its business, Nordex SE also plays a key role in international high-growth regions. The Company has offices and subsidiaries in 22 countries around the world with a total global headcount of over 2,700 employees.<\/p>\n<p><u>For more information, please contact:<\/u><\/p>\n<p>Nordex SE<br \/>Ralf Peters<br \/>Telephone: + 49 40 300 30 &#8211; 1000<br \/>rpeters@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr>\n<p>26.11.2014 Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Media archive at www.dgap-medientreff.de and www.dgap.de<\/p>\n<hr>\n<p><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\"> <!--width=600--><\/p>\n<tr>\n<td class=\"first_column\">Language:<\/td>\n<td>English<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Company:<\/td>\n<td>Nordex SE\t\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>Erich-Schlesinger-Stra\u00dfe 50\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>18059 Rostock\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>Germany\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Phone:<\/td>\n<td>+49 381 6663 3300\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Fax:<\/td>\n<td>+49 381 6663 3339\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">E-mail:<\/td>\n<td>info@nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Internet:<\/td>\n<td>www.nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ISIN:<\/td>\n<td>DE000A0D6554\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">WKN:<\/td>\n<td>A0D655\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Indices:<\/td>\n<td>TecDAX\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Listed:<\/td>\n<td>Regulierter Markt in Frankfurt (Prime Standard); Freiverkehr in Berlin, D\u00fcsseldorf, Hamburg, Hannover, M\u00fcnchen, Stuttgart\t<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td valign=\"top\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\" width=\"100%\">\n<tr>\n<td colspan=\"2\">\t\t\t\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News-Service<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\" width=\"100%\">\n<tr>\n<td>\n<hr>\n<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">299587&nbsp;&nbsp;26.11.2014<\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders 26.11.2014 \/ 08:55 Press release Nordex to build large-scale project in USA Contract awarded for the delivery of 43 N100\/2500 turbines for the \u00ab\u00a0Thunder Spirit\u00a0\u00bb wind farm Hamburg, 26 November 2014. Nordex SE has been awarded a contract for the delivery of 43 N100\/2500 turbines plus a service [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-5176","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex to build large-scale project in USA - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex to build large-scale project in USA\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders 26.11.2014 \/ 08:55 Press release Nordex to build large-scale project in USA Contract awarded for the delivery of 43 N100\/2500 turbines for the \u00ab\u00a0Thunder Spirit\u00a0\u00bb wind farm Hamburg, 26 November 2014. Nordex SE has been awarded a contract for the delivery of 43 N100\/2500 turbines plus a service [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2014-11-26T07:55:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:28:57+00:00\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex to build large-scale project in USA\",\"datePublished\":\"2014-11-26T07:55:19+00:00\",\"dateModified\":\"2023-04-24T11:28:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/\"},\"wordCount\":511,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/\",\"name\":\"Nordex to build large-scale project in USA - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\"},\"datePublished\":\"2014-11-26T07:55:19+00:00\",\"dateModified\":\"2023-04-24T11:28:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2014\\\/11\\\/nordex-to-build-large-scale-project-in-usa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex to build large-scale project in USA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex to build large-scale project in USA - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex to build large-scale project in USA","og_description":"Nordex SE \/ Key word(s): Incoming Orders 26.11.2014 \/ 08:55 Press release Nordex to build large-scale project in USA Contract awarded for the delivery of 43 N100\/2500 turbines for the \u00ab\u00a0Thunder Spirit\u00a0\u00bb wind farm Hamburg, 26 November 2014. Nordex SE has been awarded a contract for the delivery of 43 N100\/2500 turbines plus a service [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/","og_site_name":"Nordex SE","article_published_time":"2014-11-26T07:55:19+00:00","article_modified_time":"2023-04-24T11:28:57+00:00","author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex to build large-scale project in USA","datePublished":"2014-11-26T07:55:19+00:00","dateModified":"2023-04-24T11:28:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/"},"wordCount":511,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/","url":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/","name":"Nordex to build large-scale project in USA - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"datePublished":"2014-11-26T07:55:19+00:00","dateModified":"2023-04-24T11:28:57+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/11\/nordex-to-build-large-scale-project-in-usa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex to build large-scale project in USA"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=5176"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5176\/revisions"}],"predecessor-version":[{"id":8835,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5176\/revisions\/8835"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=5176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=5176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=5176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}