{"id":5121,"date":"2016-05-19T08:30:51","date_gmt":"2016-05-19T08:30:51","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/"},"modified":"2023-04-24T11:28:11","modified_gmt":"2023-04-24T11:28:11","slug":"nordex-to-install-325-mw-wind-farm-in-france","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/","title":{"rendered":"Nordex to install 32,5 MW wind farm in France"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p><span class=\"news_top_date\">2016-05-19 \/ 10:30 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr>\n<div class=\"break-word news_main\">\n<p><b>Press Release<\/b><\/p>\n<p><b>Nordex to install 32,5 MW wind farm in France <\/b><\/p>\n<p>19 May 2016. Nordex has obtained a new project order in France for 13 N100\/2500 turbines. Nordex will supply and install the turbines for the wind farm \u00ab\u00a0Eplessier\u00a0\u00bb owned by one of the funds TTR Energy manages. The company was also involved in this project to support the three shareholders SAB WindTeam GmbH, Syscom Sarl and Loscon as one of four developers, via its distribution channel \u00ab\u00a0Nordex Development\u00a0\u00bb. <\/p>\n<p>\u00ab\u00a0Eplessier\u00a0\u00bb is located in the northern French region of Picardie, in the Somme area, and the N100\/2500 is a good fit for the wind conditions at this particular site. Nordex will begin delivering the turbines, with a total capacity of 32.5 MW in October 2016, with substantial completion scheduled for the first quarter in 2017. Nordex will provide Service for \u00ab\u00a0Eplessier\u00a0\u00bb in the frame of a premium contract for a period of 15 years. <\/p>\n<p>The wind farm was mainly locally developed by Syscom Sarl, a project partner with strong regional integration. Nordex contributed to the project development particularly with their technological and permitting expertise and experience with site optimization. Finally the developer SAB WindTeam GmbH secured the financing during development phase and was in the leading role to structure the sale to the new owner.  <\/p>\n<p><b>About the Nordex group <\/b><br \/>The group has installed more than 18 GW of wind power capacity, covering more than 25 markets worldwide. Nordex and Acciona Windpower generated combined sales of EUR 3.4 billion in 2015. The company currently has over 4,800 employees. The production network is comprised of plants in Germany, Spain, Brazil, the United States and soon, also India. The range primarily concentrates on onshore turbines in the 1.5 to 3 MW class, addressing the requirements of developed as well as emerging markets.<\/p>\n<p><b>About TTR Energy<\/b><\/p>\n<p>TTR Energy raises and manages private equity funds investing in electricity producing assets and developments based on mature renewable technologies (mainly wind and photovoltaics). Main areas of investment are France and Spain. <\/p>\n<p><u>For more information, please contact:<\/u><\/p>\n<p>Nordex SE<br \/>Felix Losada<br \/>Telefon: 040 \/ 300 30 &#8211; 1000<br \/>flosada@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr>\n<p class=\"news_bottom\">2016-05-19  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td class=\"first_column column_1\">Language:<\/td>\n<td class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Company:<\/td>\n<td class=\"column_2\">Nordex SE\t\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">18059  Rostock\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Germany\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Phone:<\/td>\n<td class=\"column_2\">+49 381 6663 3300\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Fax:<\/td>\n<td class=\"column_2\">+49 381 6663 3339\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">E-mail:<\/td>\n<td class=\"column_2\">info@nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Internet:<\/td>\n<td class=\"column_2\">www.nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">ISIN:<\/td>\n<td class=\"column_2\">DE000A0D6554\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">WKN:<\/td>\n<td class=\"column_2\">A0D655\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Indices:<\/td>\n<td class=\"column_2\">TecDAX\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Listed:<\/td>\n<td class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart; Terminb\u00f6rse EUREX\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\">\t\t\t\t<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 2016-05-19 \/ 10:30 The issuer is solely responsible for the content of this announcement. Press Release Nordex to install 32,5 MW wind farm in France 19 May 2016. Nordex has obtained a new project order in France for 13 N100\/2500 turbines. Nordex will supply and install the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-5121","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex to install 32,5 MW wind farm in France - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex to install 32,5 MW wind farm in France\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 2016-05-19 \/ 10:30 The issuer is solely responsible for the content of this announcement. Press Release Nordex to install 32,5 MW wind farm in France 19 May 2016. Nordex has obtained a new project order in France for 13 N100\/2500 turbines. Nordex will supply and install the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2016-05-19T08:30:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:28:11+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex to install 32,5 MW wind farm in France\",\"datePublished\":\"2016-05-19T08:30:51+00:00\",\"dateModified\":\"2023-04-24T11:28:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\"},\"wordCount\":459,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\",\"name\":\"Nordex to install 32,5 MW wind farm in France - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2016-05-19T08:30:51+00:00\",\"dateModified\":\"2023-04-24T11:28:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage\",\"url\":\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex to install 32,5 MW wind farm in France\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex to install 32,5 MW wind farm in France - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex to install 32,5 MW wind farm in France","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 2016-05-19 \/ 10:30 The issuer is solely responsible for the content of this announcement. Press Release Nordex to install 32,5 MW wind farm in France 19 May 2016. Nordex has obtained a new project order in France for 13 N100\/2500 turbines. Nordex will supply and install the [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/","og_site_name":"Nordex SE","article_published_time":"2016-05-19T08:30:51+00:00","article_modified_time":"2023-04-24T11:28:11+00:00","og_image":[{"url":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex to install 32,5 MW wind farm in France","datePublished":"2016-05-19T08:30:51+00:00","dateModified":"2023-04-24T11:28:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/"},"wordCount":459,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage"},"thumbnailUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/","url":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/","name":"Nordex to install 32,5 MW wind farm in France - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage"},"thumbnailUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data","datePublished":"2016-05-19T08:30:51+00:00","dateModified":"2023-04-24T11:28:11+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#primaryimage","url":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data","contentUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=464939&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2016\/05\/nordex-to-install-325-mw-wind-farm-in-france\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex to install 32,5 MW wind farm in France"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=5121"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5121\/revisions"}],"predecessor-version":[{"id":13285,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5121\/revisions\/13285"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=5121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=5121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=5121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}