{"id":5034,"date":"2018-04-24T08:32:02","date_gmt":"2018-04-24T08:32:02","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/"},"modified":"2023-04-24T11:27:15","modified_gmt":"2023-04-24T11:27:15","slug":"nordex-group-awarded-contract-for-147-mw-in-south-africa","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/","title":{"rendered":"Nordex Group awarded contract for 147 MW in South Africa"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p><span class=\"news_top_date\">24.04.2018 \/ 10:32 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div class=\"break-word news_main\">\n<p><b>Nordex Group awarded contract for 147 MW in South Africa<\/b><\/p>\n<p><b>Hamburg, 24 April 2018. <\/b>With the signing of the power purchase agreement by public-sector utility Eskom, the contract for the installation of the South African wind farm \u00ab\u00a0Roggeveld\u00a0\u00bb has now also come into effect. This order for the Nordex Group entails 47 AW125\/3150 and AW125\/3000 turbines with a combined capacity of around 147 megawatts and a high capacity factor of more than 47 percent. The contract comprises the delivery of the turbines including the towers, which are to be produced in South Africa, as well as service for at least 15 years.<\/p>\n<p>Local installation work near Laingsburg will be commencing in 2019, creating a good 700 jobs in the construction and operation of the wind farm. Through a broad based approach this job creation will benefit local communities empowering young South Africans to build their future in clean energy. Moreover, the farm will improve the country&rsquo;s carbon footprint as it will reduce around 24,000 tons of carbon dioxide emissions from the production of electricity each year.<\/p>\n<p>Building Energy, the customer and owner of the wind farm, is committed to improving the world&rsquo;s future by investing in clean power stations. With operations all around the globe, the independent power producer applied for a feed-in licence in 2015 in the fourth round of tenders in South Africa this licence was accepted by energy minister Jeff Radebe at the beginning of April. The 27 projects approved by the minister include further wind farms for the Nordex Group. However, these additional projects are not yet order intake.<\/p>\n<p>&nbsp;<\/p>\n<p><b>About the Nordex Group<\/b><br \/>The Group has installed wind power capacity of more than 23 GW in over 25 markets, generating sales of almost EUR 3.1 billion in 2017. It currently has roughly 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 &#8211; 4.5 MW class addressing the requirements of land constrained as well as grid constrained markets.<\/p>\n<p><u>For more information, please contact:<\/u><\/p>\n<p>Nordex SE<br \/>Ralf Peters<br \/>Telephone: + 49 40 300 30 &#8211; 1522<br \/>rpeters@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">24.04.2018  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td class=\"first_column column_1\" nowrap>Language:<\/td>\n<td class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Company:<\/td>\n<td class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Phone:<\/td>\n<td class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Fax:<\/td>\n<td class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>E-mail:<\/td>\n<td class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Internet:<\/td>\n<td class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>ISIN:<\/td>\n<td class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>WKN:<\/td>\n<td class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Indices:<\/td>\n<td class=\"column_2\">TecDAX<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Listed:<\/td>\n<td class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 24.04.2018 \/ 10:32 The issuer is solely responsible for the content of this announcement. Nordex Group awarded contract for 147 MW in South Africa Hamburg, 24 April 2018. With the signing of the power purchase agreement by public-sector utility Eskom, the contract for the installation of the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-5034","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex Group awarded contract for 147 MW in South Africa - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex Group awarded contract for 147 MW in South Africa\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 24.04.2018 \/ 10:32 The issuer is solely responsible for the content of this announcement. Nordex Group awarded contract for 147 MW in South Africa Hamburg, 24 April 2018. With the signing of the power purchase agreement by public-sector utility Eskom, the contract for the installation of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-24T08:32:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:27:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex Group awarded contract for 147 MW in South Africa\",\"datePublished\":\"2018-04-24T08:32:02+00:00\",\"dateModified\":\"2023-04-24T11:27:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\"},\"wordCount\":461,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\",\"name\":\"Nordex Group awarded contract for 147 MW in South Africa - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2018-04-24T08:32:02+00:00\",\"dateModified\":\"2023-04-24T11:27:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage\",\"url\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex Group awarded contract for 147 MW in South Africa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex Group awarded contract for 147 MW in South Africa - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex Group awarded contract for 147 MW in South Africa","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 24.04.2018 \/ 10:32 The issuer is solely responsible for the content of this announcement. Nordex Group awarded contract for 147 MW in South Africa Hamburg, 24 April 2018. With the signing of the power purchase agreement by public-sector utility Eskom, the contract for the installation of the [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/","og_site_name":"Nordex SE","article_published_time":"2018-04-24T08:32:02+00:00","article_modified_time":"2023-04-24T11:27:15+00:00","og_image":[{"url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex Group awarded contract for 147 MW in South Africa","datePublished":"2018-04-24T08:32:02+00:00","dateModified":"2023-04-24T11:27:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/"},"wordCount":461,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/","url":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/","name":"Nordex Group awarded contract for 147 MW in South Africa - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data","datePublished":"2018-04-24T08:32:02+00:00","dateModified":"2023-04-24T11:27:15+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#primaryimage","url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=678101&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/04\/nordex-group-awarded-contract-for-147-mw-in-south-africa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex Group awarded contract for 147 MW in South Africa"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=5034"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5034\/revisions"}],"predecessor-version":[{"id":13168,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5034\/revisions\/13168"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=5034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=5034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=5034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}