{"id":5021,"date":"2018-10-04T05:30:03","date_gmt":"2018-10-04T05:30:03","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/"},"modified":"2023-04-24T11:27:08","modified_gmt":"2023-04-24T11:27:08","slug":"nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/","title":{"rendered":"Nordex builds first larger wind farm with new N149 turbines in Finland"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p><span class=\"news_top_date\">04.10.2018 \/ 07:30 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div class=\"break-word news_main\">\n<p>Project for 18 turbines signed with Neoen<\/p>\n<p><b>Hamburg, 4 October 2018<\/b>. In September, the Nordex Group has received an order from project developer Neoen, for the installation of the 81 MW wind farm \u00ab\u00a0Hedet\u00a0\u00bb. The project comprises 18 turbines from the new N149\/4.0-4.5 series, which the Nordex Group is to install for its customer on a turnkey basis. Once all the turbines have been set up, the two companies are to collaborate over the long term and have concluded a Premium Service contract covering a period of fifteen years.<\/p>\n<p>\u00ab\u00a0This first large order for the N149\/4.0-4.5 with a long-term service contract is a very positive sign for the acceptance of our latest turbine generation in the market,\u00a0\u00bb says Jos\u00e9 Luis Blanco, CEO of Nordex SE.<\/p>\n<p>Nordex will shortly be starting the preparatory work, such as road and foundation works. The first turbine is to be set up in mid-2019 and the wind farm will be connected to the grid in the course of the year.<\/p>\n<p>\u00ab\u00a0Hedet\u00a0\u00bb lies in the west of Finland, near the town of N\u00e4rpes, 15 kilometres from the coast of the Bothnian Bay. At the low to medium wind site the hub heights of the turbines will be 135 metres.<\/p>\n<p>In September 2018 Google and Neoen signed a contract (Corporate PPA) for the purchase of wind power from \u00ab\u00a0Hedet\u00a0\u00bb to supply a data centre.<\/p>\n<p><b>Neoen &#8211; a profile<\/b><br \/>Founded in 2008, Neoen is France&rsquo;s and one of the world&rsquo;s leading independent producers (IPP) of renewable energy. With a current capacity of almost 2 GW already in operation or under construction, and a further 1 GW of projects formally awarded and secured, Neoen has doubled its size in over just 24 months. Neoen is active in France, Australia, El Salvador, Zambia, Jamaica, Portugal, Mexico, Mozambique, Finland and Argentina and has assets in more than 15 countries. It operates Europe&rsquo;s most powerful solar PV farm (300 MW in Cestas, France) and the world&rsquo;s largest lithiumion power reserve in Hornsdale, Australia (100 MW\/129 MWh storage capacity). At the end of 2017, Neoen won one of the largest (375 MW) and the most competitive solar project in Mexico. Neoen&rsquo;s main shareholders are Impala (owned by Jacques Veyrat), the Capenergie II and Capenergie 3 funds (managed by Omnes Capital) and Bpifrance. Neoen is targeting 5 GW capacity in operation and under construction by 2021.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>The Group has installed more than 23 GW of wind energy capacity in over 25 markets and in 2017 generated revenues of EUR 3.1 billion. The company currently has about 5,000 employees. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States and India. The product portfolio is focused on onshore turbines in the 1.5 to 4.8 MW class, which are tailor-made for the market requirements in countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><\/p>\n<p><b>Nordex SE<\/b><br \/>Felix Losada<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/><b>Nordex SE<\/b><br \/>Felix Zander<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\" target=\"_blank\" rel=\"noopener noreferrer\">fzander@nordex-online.com<\/a><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">04.10.2018  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td class=\"first_column column_1\" nowrap>Language:<\/td>\n<td class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Company:<\/td>\n<td class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Phone:<\/td>\n<td class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Fax:<\/td>\n<td class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>E-mail:<\/td>\n<td class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Internet:<\/td>\n<td class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>ISIN:<\/td>\n<td class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>WKN:<\/td>\n<td class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Indices:<\/td>\n<td class=\"column_2\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Listed:<\/td>\n<td class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 04.10.2018 \/ 07:30 The issuer is solely responsible for the content of this announcement. Project for 18 turbines signed with Neoen Hamburg, 4 October 2018. In September, the Nordex Group has received an order from project developer Neoen, for the installation of the 81 MW wind farm [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-5021","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex builds first larger wind farm with new N149 turbines in Finland - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex builds first larger wind farm with new N149 turbines in Finland\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 04.10.2018 \/ 07:30 The issuer is solely responsible for the content of this announcement. Project for 18 turbines signed with Neoen Hamburg, 4 October 2018. In September, the Nordex Group has received an order from project developer Neoen, for the installation of the 81 MW wind farm [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-04T05:30:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:27:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex builds first larger wind farm with new N149 turbines in Finland\",\"datePublished\":\"2018-10-04T05:30:03+00:00\",\"dateModified\":\"2023-04-24T11:27:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/\"},\"wordCount\":614,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/\",\"name\":\"Nordex builds first larger wind farm with new N149 turbines in Finland - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2018-10-04T05:30:03+00:00\",\"dateModified\":\"2023-04-24T11:27:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#primaryimage\",\"url\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2018\\\/10\\\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex builds first larger wind farm with new N149 turbines in Finland\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex builds first larger wind farm with new N149 turbines in Finland - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex builds first larger wind farm with new N149 turbines in Finland","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 04.10.2018 \/ 07:30 The issuer is solely responsible for the content of this announcement. Project for 18 turbines signed with Neoen Hamburg, 4 October 2018. In September, the Nordex Group has received an order from project developer Neoen, for the installation of the 81 MW wind farm [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/","og_site_name":"Nordex SE","article_published_time":"2018-10-04T05:30:03+00:00","article_modified_time":"2023-04-24T11:27:08+00:00","og_image":[{"url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex builds first larger wind farm with new N149 turbines in Finland","datePublished":"2018-10-04T05:30:03+00:00","dateModified":"2023-04-24T11:27:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/"},"wordCount":614,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/","url":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/","name":"Nordex builds first larger wind farm with new N149 turbines in Finland - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data","datePublished":"2018-10-04T05:30:03+00:00","dateModified":"2023-04-24T11:27:08+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#primaryimage","url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=729837&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2018\/10\/nordex-builds-first-larger-wind-farm-with-new-n149-turbines-in-finland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex builds first larger wind farm with new N149 turbines in Finland"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=5021"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5021\/revisions"}],"predecessor-version":[{"id":13154,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/5021\/revisions\/13154"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=5021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=5021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=5021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}