{"id":42924,"date":"2025-11-18T06:30:03","date_gmt":"2025-11-18T06:30:03","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/"},"modified":"2026-03-03T06:08:17","modified_gmt":"2026-03-03T06:08:17","slug":"nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/","title":{"rendered":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany <\/p>\n<p>18.11.2025 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 18. November 2025<\/b>. The Nordex Group has received a new order in Germany from Energieversorgung Mittelrhein (evm), together with Stadtwerke Karlsruhe and Th\u00fcga Erneuerbare Energien: For the 77 MW Schneifelh\u00f6he wind farm, Nordex will install eleven N163\/6.X wind turbines. The Nordex Group will also be responsible for maintenance of the turbines under a 20-year full-service contract.<\/p>\n<p>The Schneifelh\u00f6he project is being developed on the forested Schneifel ridge in the Bitburg-Pr\u00fcm district of Rhineland-Palatinate. The Delta4000 turbines, each with a nominal output of 7 MW and hub heights of 164 meters, take advantage of excellent wind conditions at an altitude of 630 to 670 meters above sea level.<\/p>\n<p>Construction on site began in October 2025, with commissioning scheduled for the second half of 2027.<\/p>\n<p>\u00ab\u00a0We are very pleased to be making another important contribution to the energy transition in Rhineland-Palatinate with this project and to sustainably strengthen the region&rsquo;s security of energy supply,\u00a0\u00bb said Felipe Villalon Waldburg-Zeil, Director Sales Region Central of the Nordex Group. \u00ab\u00a0For this order, we are working in partnership with the region&rsquo;s leading utility Energieversorgung Mittelrhein (evm), Stadtwerke Karlsruhe, and Th\u00fcga Erneuerbare Energien. Our state-of-the-art Delta4000 turbines, specially designed for the region&rsquo;s wind conditions, will be used. This means our customers benefit from innovative technology combined with reliable partnership, enabling sustainable, forward-looking energy supply for the local people.\u00a0\u00bb<\/p>\n<p><b>About the Nordex Group<\/b><\/p>\n<p>The Group has installed around 57 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 7.3 billion in 2024. The Company currently has more than 10,400 employees with a manufacturing network that includes factories in Germany, Spain, Brazil, India and USA. Its product portfolio is focused on onshore turbines in the 4 to 7 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with constrained grid capacity.<\/p>\n<p><u>Contact person for press:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nTelephone: +49 (0) 40 30030 1141<br \/>\nE-mail: flosada@nordex-online.com<\/p>\n<p>\u00a0<\/p>\n<p><u>Contact for investor inquiries:<\/u><br \/>\nNordex SE<br \/>\nAnja Siehler<br \/>\nPhone: +49 162 3515 334<br \/>\nE-mail: asiehler@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n18.11.2025 CET\/CEST Dissemination of a Corporate News, transmitted by <a href=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=redirect&amp;url=2be925ac0334ae7b4f51fbaee4a6daf0&amp;application_id=2231086&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3&amp;application_name=news\">EQS News<\/a> &#8211; a service of <a href=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=redirect&amp;url=f5d50dc7e8798b6eb177f7955e598e60&amp;application_id=2231086&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3&amp;application_name=news\">EQS Group<\/a>.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>\nView original content: <a href=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=redirect&amp;url=d2923c77f9df6d833f66a31473434527&amp;application_id=2231086&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3&amp;application_name=news\">EQS News<\/a>\n<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">investor-relations@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">2231086<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>2231086\u00a0\u00a018.11.2025\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" alt=\"\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany 18.11.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 18. November 2025. The Nordex Group has received a new order in Germany from Energieversorgung [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-42924","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany 18.11.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 18. November 2025. The Nordex Group has received a new order in Germany from Energieversorgung [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-18T06:30:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-03T06:08:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany\",\"datePublished\":\"2025-11-18T06:30:03+00:00\",\"dateModified\":\"2026-03-03T06:08:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\"},\"wordCount\":489,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\",\"name\":\"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"datePublished\":\"2025-11-18T06:30:03+00:00\",\"dateModified\":\"2026-03-03T06:08:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany 18.11.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 18. November 2025. The Nordex Group has received a new order in Germany from Energieversorgung [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/","og_site_name":"Nordex SE","article_published_time":"2025-11-18T06:30:03+00:00","article_modified_time":"2026-03-03T06:08:17+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany","datePublished":"2025-11-18T06:30:03+00:00","dateModified":"2026-03-03T06:08:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/"},"wordCount":489,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/","url":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/","name":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","datePublished":"2025-11-18T06:30:03+00:00","dateModified":"2026-03-03T06:08:17+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2231086&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/11\/nordex-group-secures-77-mw-contract-for-schneifelhohe-wind-farm-green-energy-for-rhineland-palatinate-in-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex Group secures 77 MW contract for Schneifelh\u00f6he wind farm \u2013 green energy for Rhineland-Palatinate in Germany"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=42924"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42924\/revisions"}],"predecessor-version":[{"id":42925,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42924\/revisions\/42925"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=42924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=42924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=42924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}