{"id":42801,"date":"2025-09-24T05:30:03","date_gmt":"2025-09-24T05:30:03","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/"},"modified":"2026-01-05T06:01:04","modified_gmt":"2026-01-05T06:01:04","slug":"nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/","title":{"rendered":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm <\/p>\n<p>24.09.2025 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 24 September 2025.<\/b> The Nordex Group has received its first order from Spain for the supply of N175\/6.X wind turbines. The independent power producer (IPP) Abei Energy, based in Madrid, has ordered eight turbines for the Avellanosa wind farm, located northwest of Burgos in the Castile and Le\u00f3n region of Spain.<\/p>\n<p>In addition, Abei Energy has opted for the Nordex Group\u2019s Premium Service for maintenance of the turbines with a 20-year term. This ensures the power producer long-term operational reliability and maximum energy yields.<\/p>\n<p>The N175 turbines will be delivered and installed by the Nordex Group on tubular steel towers with a hub height of 119 meters. The installation of the turbines is scheduled to begin in late summer 2026, with commissioning planned for early 2027.<\/p>\n<p>\u201cWe are very pleased with the trust placed in us by Abei Energy and to be installing the N175\/6.X in Spain for the first time with this project,\u201d says Francisco Cejudo, Director Sales Spain at Nordex Group. \u201cThe turbine type is ideal for the site conditions in Spain. We are confident that, whenever permitting conditions allow, this turbine will deliver the best results for our customers and become a key asset in future wind energy projects in the country.\u201d<\/p>\n<p>\u201cThis agreement represents a key step toward achieving Abei\u2019s expansion goals of developing, building, and operating its own assets in the Spanish wind energy market and reinforces its commitment to the energy transition and decarbonization,\u201d said Luis Barrado, Global EPC Managing Director of Abei Energy.<\/p>\n<p><b>About the Nordex Group<\/b><\/p>\n<p>The Group has installed around 57 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 7.3 billion in 2024. The Company currently has more than 10,400 employees with a manufacturing network that includes factories in Germany, Spain, Brazil, India and USA. Its product portfolio is focused on onshore turbines in the 4 to 7 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with constrained grid capacity.<\/p>\n<p><u>Contact person for press:\u00a0<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nTelephone: +49 (0) 40 30030 1141<br \/>\nE-mail: flosada@nordex-online.com<\/p>\n<p><u>Contact for investor inquiries:<\/u><br \/>\nNordex SE<br \/>\nAnja Siehler<br \/>\nPhone: +49 162 3515 334<br \/>\nE-mail: asiehler@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n24.09.2025 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">investor-relations@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">2201980<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>2201980\u00a0\u00a024.09.2025\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" alt=\"\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm 24.09.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 24 September 2025. The Nordex Group has received its first order from Spain for the supply of N175\/6.X [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-42801","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm 24.09.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 24 September 2025. The Nordex Group has received its first order from Spain for the supply of N175\/6.X [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-24T05:30:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-05T06:01:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm\",\"datePublished\":\"2025-09-24T05:30:03+00:00\",\"dateModified\":\"2026-01-05T06:01:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\"},\"wordCount\":514,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\",\"name\":\"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"datePublished\":\"2025-09-24T05:30:03+00:00\",\"dateModified\":\"2026-01-05T06:01:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm 24.09.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 24 September 2025. The Nordex Group has received its first order from Spain for the supply of N175\/6.X [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/","og_site_name":"Nordex SE","article_published_time":"2025-09-24T05:30:03+00:00","article_modified_time":"2026-01-05T06:01:04+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm","datePublished":"2025-09-24T05:30:03+00:00","dateModified":"2026-01-05T06:01:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/"},"wordCount":514,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/","url":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/","name":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","datePublished":"2025-09-24T05:30:03+00:00","dateModified":"2026-01-05T06:01:04+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2201980&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/09\/nordex-secures-first-spanish-order-for-n175-6-x-turbines-for-a-50-mw-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex secures first Spanish order for N175\/6.X turbines for a 50 MW wind farm"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=42801"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42801\/revisions"}],"predecessor-version":[{"id":42802,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42801\/revisions\/42802"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=42801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=42801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=42801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}