{"id":42476,"date":"2025-07-01T05:30:04","date_gmt":"2025-07-01T05:30:04","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/"},"modified":"2025-11-06T06:30:58","modified_gmt":"2025-11-06T06:30:58","slug":"nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/","title":{"rendered":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia <\/p>\n<p>01.07.2025 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 1. July 2025.<\/b> With an order received in June, the Nordex Group scores again in Latvia: The Group is supplying and installing 21 N163\/6.X turbines for the Pienava wind farm. Totalling 147 MW it is the largest wind project to date in the country. Developed by Eolus, one of the largest renewable energy solutions developers in Scandinavia, the project has been sold to Latvenergo, Latvia\u2019s state-owned energy company.<\/p>\n<p>After commissioning in March 2027, the Nordex Group will be responsible for the maintenance of the turbines as part of a maintenance contract with a term of 15 years.<\/p>\n<p>The Pienava wind farm is being built in the municipality of Tukums, southwest of Riga. The turbines of the Delta4000 series will be delivered and installed from summer 2026 on 169 meters tubular steel towers in the cold climate version.<\/p>\n<p>The Nordex Group only entered the Latvian market in 2024 with an initial order for 109 MW. Today, 300 MW are already under construction.<\/p>\n<p><b>About the Nordex Group<\/b><\/p>\n<p>The Group has installed around 57 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 7.3 billion in 2024. The Company currently has more than 10,400 employees with a manufacturing network that includes factories in Germany, Spain, Brazil, India, USA and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with constrained grid capacity.<\/p>\n<p><u>Contact person for press<\/u>:<br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nTelephone: +49 (0) 40 30030 1141<br \/>\nE-mail: flosada@nordex-online.com<\/p>\n<p><u>Contact for investor inquiries:<\/u><br \/>\nNordex SE<br \/>\nAnja Siehler<br \/>\nPhone: +49 162 3515 334<br \/>\nE-mail: asiehler@nordex-online.com<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n01.07.2025 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">investor-relations@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">2162584<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>2162584\u00a0\u00a001.07.2025\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" alt=\"\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia 01.07.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 1. July 2025. With an order received in June, the Nordex Group scores again in [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-42476","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia 01.07.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 1. July 2025. With an order received in June, the Nordex Group scores again in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-01T05:30:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-06T06:30:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia\",\"datePublished\":\"2025-07-01T05:30:04+00:00\",\"dateModified\":\"2025-11-06T06:30:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/\"},\"wordCount\":419,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/\",\"name\":\"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"datePublished\":\"2025-07-01T05:30:04+00:00\",\"dateModified\":\"2025-11-06T06:30:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2025\\\/07\\\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia 01.07.2025 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 1. July 2025. With an order received in June, the Nordex Group scores again in [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/","og_site_name":"Nordex SE","article_published_time":"2025-07-01T05:30:04+00:00","article_modified_time":"2025-11-06T06:30:58+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia","datePublished":"2025-07-01T05:30:04+00:00","dateModified":"2025-11-06T06:30:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/"},"wordCount":419,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/","url":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/","name":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","datePublished":"2025-07-01T05:30:04+00:00","dateModified":"2025-11-06T06:30:58+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=2162584&amp;application_name=news&amp;site_id=airport_aws~~~7cc68db1-74de-43c8-af69-2ae0a97efdc3"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2025\/07\/nordex-group-to-deliver-21-turbines-totalling-147-mw-for-largest-wind-project-to-date-in-latvia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex Group to deliver 21 turbines totalling 147 MW for largest wind project to date in Latvia"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42476","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=42476"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42476\/revisions"}],"predecessor-version":[{"id":42477,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/42476\/revisions\/42477"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=42476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=42476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=42476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}