{"id":12747,"date":"2022-10-13T05:30:08","date_gmt":"2022-10-13T05:30:08","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/"},"modified":"2025-08-14T06:56:25","modified_gmt":"2025-08-14T06:56:25","slug":"nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/","title":{"rendered":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity <\/p>\n<p>13.10.2022 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 13 October 2022. <\/b>At the end of September, the Nordex Group obtained an order to supply and install 10 N149\/4.X turbines for a wind farm in Croatia. The order also includes a Premium Service contract for the turbines. The Nordex Group has also signed a 20-year contract for maintenance of the turbines, which also includes an option to extend service of the turbines for a further 10 years.<\/p>\n<p>The wind farm, with an installed nominal capacity of 50 MW, is being built in the municipality of Gracac. The Nordex Group will start installation of the N149\/4.X turbines on 105-metre tubular steel towers in summer 2023 with commissioning scheduled for the end of the same year.<\/p>\n<p>The name of the customer and of the project are undisclosed.<\/p>\n<p>For the Nordex Group the project represents the second order this year from this Mediterranean country for turbines from the Delta4000 series. In February 2022 the Nordex Group had received an order for 25 N149\/5.X turbines with a total rated output of 137 MW for a wind farm near the Dalmatian coast.<\/p>\n<p>To date the Nordex Group has installed turbines with 312 MW in Croatia. Together with the orders from 2022, the capacity of Nordex turbines here will increase to almost 500 MW.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><\/p>\n<p>The Group has installed more than 41 GW of wind energy capacity in over 40 markets and in 2021 generated revenues of EUR 5.4 billion. The company currently employs a workforce of approx. 9,000. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>Contact person for press:<\/u><\/p>\n<p>Nordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 \u2013 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 \u2013 1116<br \/>\nfzander@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n13.10.2022 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1462207<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1462207\u00a0\u00a013.10.2022\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity 13.10.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 13 October 2022. At the end of September, the Nordex Group obtained [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-12747","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity 13.10.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 13 October 2022. At the end of September, the Nordex Group obtained [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-13T05:30:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:56:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity\",\"datePublished\":\"2022-10-13T05:30:08+00:00\",\"dateModified\":\"2025-08-14T06:56:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\"},\"wordCount\":471,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\",\"name\":\"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2022-10-13T05:30:08+00:00\",\"dateModified\":\"2025-08-14T06:56:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity 13.10.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 13 October 2022. At the end of September, the Nordex Group obtained [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/","og_site_name":"Nordex SE","article_published_time":"2022-10-13T05:30:08+00:00","article_modified_time":"2025-08-14T06:56:25+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity","datePublished":"2022-10-13T05:30:08+00:00","dateModified":"2025-08-14T06:56:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/"},"wordCount":471,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/","url":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/","name":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2022-10-13T05:30:08+00:00","dateModified":"2025-08-14T06:56:25+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1462207&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/10\/nordex-se-nordex-group-wins-out-in-croatia-with-order-for-a-wind-farm-with-50-mw-installed-nominal-capacity\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group wins out in Croatia with order for a wind farm with 50 MW installed nominal capacity"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=12747"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12747\/revisions"}],"predecessor-version":[{"id":42625,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12747\/revisions\/42625"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=12747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=12747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=12747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}