{"id":12154,"date":"2022-03-23T06:30:16","date_gmt":"2022-03-23T06:30:16","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/"},"modified":"2025-08-14T06:56:27","modified_gmt":"2025-08-14T06:56:27","slug":"nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/","title":{"rendered":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland <\/p>\n<p>23.03.2022 \/ 07:30 <\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div><b>Hamburg, 23 March 2022.<\/b> The French operator of green energy projects, Valorem, has commissioned the Nordex Group to supply 57 N163\/5.X turbines for two projects in Finland. The orders also include a premium plus service contract for thirty five years.<\/p>\n<p>30 N163\/5.X turbines of the Delta4000 series are planned for the \u00ab\u00a0Kalistanneva\u00a0\u00bb wind farm, which was sold by Valorem to a Finnish Consortium comprised of HELEN Oy and the Bank of \u00c5lands&rsquo;s Wind Power Fund. The Nordex Group is supplying a further 27 turbines of the same turbine type to the \u00ab\u00a0Matkussaari\u00a0\u00bb wind farm. Here, AIP Management provides flexible long-term financing in partnership with Valorem. Valorem has developed, will build and operate the wind farm. Both wind farms are located in the Ostrobothnia region.<\/p>\n<p>The \u00ab\u00a0Kalistanneva\u00a0\u00bb and \u00ab\u00a0Matkussaari\u00a0\u00bb wind farms form part of the larger Viiatti project, one of the five largest wind farms in Finland currently being built. Infrastructure works will start in spring 2022. The turbines will be delivered and installed 2024 on tubular steel towers with a hub height of 148 metres and equipped as a cold climate variant with a capacity of 5.5 MW. Upon completion, both wind farms will generate approximately 1 TWh of clean electricity, equivalent to a good 1.2 percent of Finland&rsquo;s annual electricity consumption.<\/p>\n<p><b>About VALOREM<\/b><br \/>\nThe VALOREM group is an independent French operator in the field of green energy. It masters the entire process of renewable energy development, from development to operation and maintenance, including project management, construction and auditing services. A pioneer in wind energy in France with more than 360 employees, VALOREM is also present in the French West Indies, Colombia, Finland and Greece. The group manages more than 550 MW in production and has a portfolio of more than 5 GW of in-development projects. VALOREM is certified ISO 9001 &#8211; quality, ISO 14001 &#8211; environment, and ISO 45001 &#8211; health and safety at work. More information on: www.valorem-energie.com<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 39 GW of wind power capacity in over 40 markets and generated sales of around EUR 5.4 billion in 2021. The Company currently has more than 8,600 employees. The Group&rsquo;s manufacturing network includes factories in Germany, Spain, Brazil, the USA, India and Mexico. Its product portfolio is mainly focused on onshore turbines in the 4 to 6.X MW class which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.<\/p>\n<p><u>Contact person for press:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><u>fzander@nordex-online.com<\/u><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n23.03.2022  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1308609<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1308609\u00a0\u00a023.03.2022\u00a0\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland 23.03.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 23 March 2022. The French operator of green energy projects, Valorem, has commissioned the Nordex Group to supply 57 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-12154","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland 23.03.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 23 March 2022. The French operator of green energy projects, Valorem, has commissioned the Nordex Group to supply 57 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-23T06:30:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:56:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland\",\"datePublished\":\"2022-03-23T06:30:16+00:00\",\"dateModified\":\"2025-08-14T06:56:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\"},\"wordCount\":565,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\",\"name\":\"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2022-03-23T06:30:16+00:00\",\"dateModified\":\"2025-08-14T06:56:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland 23.03.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 23 March 2022. The French operator of green energy projects, Valorem, has commissioned the Nordex Group to supply 57 [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/","og_site_name":"Nordex SE","article_published_time":"2022-03-23T06:30:16+00:00","article_modified_time":"2025-08-14T06:56:27+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland","datePublished":"2022-03-23T06:30:16+00:00","dateModified":"2025-08-14T06:56:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/"},"wordCount":565,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/","url":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/","name":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2022-03-23T06:30:16+00:00","dateModified":"2025-08-14T06:56:27+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1308609&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/03\/nordex-se-nordex-group-receives-two-orders-for-313-5-mw-from-valorem-from-finland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group receives two orders for 313.5 MW from Valorem from Finland"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=12154"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12154\/revisions"}],"predecessor-version":[{"id":42653,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/12154\/revisions\/42653"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=12154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=12154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=12154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}