{"id":11974,"date":"2022-01-12T06:30:06","date_gmt":"2022-01-12T06:30:06","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/"},"modified":"2025-08-14T06:56:27","modified_gmt":"2025-08-14T06:56:27","slug":"nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/","title":{"rendered":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia <\/p>\n<p>12.01.2022 \/ 07:30 <\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div><b>Hamburg, 12 January 2022.<\/b> End of 2021, the Nordex Group secured an order from Spain: for RWE Renewables Iberia, the manufacturer is supplying nine N149\/4.X turbines for the \u00ab\u00a0Rea Unificado\u00a0\u00bb wind farm project. The order also includes a service contract for a period of two years.<\/p>\n<p>The 43.2 MW \u00ab\u00a0Rea Unificado\u00a0\u00bb wind farm is being built in the province of Soria in the Castilla and Le\u00f3n region. The delivery and installation of the turbines on 105-metre tubular steel towers is planned for summer 2022. The commissioning of the wind turbines with a nominal output of 4.8 MW is scheduled for the end of the same year.<\/p>\n<p>The wind farm is located almost 150 kilometres from the Nordex production plant in Bar\u00e1soain, where the N149 nacelles will be manufactured.<\/p>\n<p>\u00ab\u00a0We are delighted with the new order from RWE and the renewed vote of confidence in our Delta4000 technology. With this latest order, we are further expanding our market share in Spain,\u00a0\u00bb says Patxi Landa, CSO at the Nordex Group. The Nordex Group received orders about approx. 400 MW from Spain in 2021.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 37 GW of wind energy capacity in over 40 markets and in 2020 generated revenues of EUR 4.6 billion. The company currently employs a workforce of approx. 8,500. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>Contact for press:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><u>fzander@nordex-online.com<\/u><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n12.01.2022  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1267514<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1267514\u00a0\u00a012.01.2022\u00a0\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia 12.01.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 12 January 2022. End of 2021, the Nordex Group secured an order from Spain: for RWE Renewables Iberia, the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-11974","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia 12.01.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 12 January 2022. End of 2021, the Nordex Group secured an order from Spain: for RWE Renewables Iberia, the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-12T06:30:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:56:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia\",\"datePublished\":\"2022-01-12T06:30:06+00:00\",\"dateModified\":\"2025-08-14T06:56:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\"},\"wordCount\":427,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\",\"name\":\"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\",\"datePublished\":\"2022-01-12T06:30:06+00:00\",\"dateModified\":\"2025-08-14T06:56:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia 12.01.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 12 January 2022. End of 2021, the Nordex Group secured an order from Spain: for RWE Renewables Iberia, the [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/","og_site_name":"Nordex SE","article_published_time":"2022-01-12T06:30:06+00:00","article_modified_time":"2025-08-14T06:56:27+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia","datePublished":"2022-01-12T06:30:06+00:00","dateModified":"2025-08-14T06:56:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/"},"wordCount":427,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/","url":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/","name":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio","datePublished":"2022-01-12T06:30:06+00:00","dateModified":"2025-08-14T06:56:27+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1267514&amp;application_name=news&amp;site_id=airport_minio"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2022\/01\/nordex-se-nordex-receives-order-for-43-mw-from-spain-from-rwe-renewables-iberia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex receives order for 43 MW from Spain from RWE Renewables Iberia"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/11974","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=11974"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/11974\/revisions"}],"predecessor-version":[{"id":42660,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/11974\/revisions\/42660"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=11974"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=11974"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=11974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}