{"id":10389,"date":"2014-08-12T07:05:13","date_gmt":"2014-08-12T07:05:13","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/"},"modified":"2023-08-28T10:26:09","modified_gmt":"2023-08-28T10:26:09","slug":"nordex-to-build-polish-wind-farm-orla-2","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/","title":{"rendered":"Nordex to build Polish wind farm &lsquo;Orla&rsquo;"},"content":{"rendered":"<table class=\"news_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td><\/p>\n<p>Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p>12.08.2014 \/ 09:05<\/p>\n<hr>\n<div class=\"break-word\">\n<p><b>Press release<\/b><\/p>\n<p><b>Nordex to build Polish wind farm \u00ab\u00a0Orla\u00a0\u00bb<\/b><br \/>Contract awarded for first construction phase \/ 37.5 MW wind farm to go into operation in 2015<\/p>\n<p><b>Hamburg, 12 August 2014.<\/b> Wind turbine manufacturer Nordex has been awarded a contract for the delivery and installation of nine turbines from its N100\/2500 series. This constitutes the first construction phase of the 37.5 MW \u00ab\u00a0Orla\u00a0\u00bb wind farm, which will comprise a total of 15 N100\/2500 wind turbines as cold climate version. The turbines which have now been ordered are to go into operation as early as in December 2014, with the other six to follow by mid next year. <\/p>\n<p>The Orla project was initiated in 2008 and developed since by the project development arm of Nordex. \u00ab\u00a0This is going to be the first realization from our pipeline of own developed projects in Poland. It is a good illustration of how Nordex can provide more value to the market with quality projects\u00a0\u00bb, says Lars Bondo Krogsgaard, a member of Nordex SE&rsquo;s Management Board.<\/p>\n<p>The client is the project company \u00ab\u00a0C&amp;C Wind\u00a0\u00bb owned by international private-equity investors and an independent power producer. The project finance has largely been provided by the European Bank for Reconstruction and Development (EBRD). <\/p>\n<p>Located in the eastern part of Poland, the wind farm is to generate an annual energy yield of up to 100 gigawatt\/hours, resulting in a capacity factor of an above-average 33 percent. At the same time, it will avoid emissions of around 57,000 tons of carbon dioxide which would otherwise arise from thermal power stations. Under the targets set by the European Union, Poland has undertaken to roughly double the proportion of renewable energies in its national energy balance to 20 percent by 2021.<\/p>\n<p><b>About Nordex<\/b><br \/>As one of the technological leaders in multi-megawatt wind power systems, Nordex is benefiting from the trend in favour of large-scale turbines. The Generation Gamma range comprises the N90\/2500, N100\/2500 and the N117\/2400, which is one of the most efficient series turbines for non-coastal regions. To date, over 2,600 of these turbines have been produced. With Generation Delta, Nordex is now offering the fourth generation of its proven multi-megawatt platform (N100\/3300, N117\/3000, N131\/3000). Nordex has installed a total of over 6,000 turbines with an aggregate capacity of around 10,000 MW all around the world. With exports accounting for around 80 percent of its business, Nordex SE also plays a key role in international high-growth regions. The Company has offices and subsidiaries in 22 countries around the world with a total global headcount of over 2,700 employees.<\/p>\n<p><u>For more information, please contact:<\/u><\/p>\n<p>Nordex SE<br \/>Ralf Peters<br \/>Telephone: + 49 40 300 30 &#8211; 1000<br \/><a href='mailto:rpeters@nordex-online.com' target='_blank' rel=\"noopener\">rpeters@nordex-online.com<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr>\n<p>12.08.2014 Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Media archive at www.dgap-medientreff.de and www.dgap.de<\/p>\n<hr>\n<p><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\"> <!--width=600--><\/p>\n<tr>\n<td class=\"first_column\">Language:<\/td>\n<td>English<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Company:<\/td>\n<td>Nordex SE\t\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>Erich-Schlesinger-Stra\u00dfe 50\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>18059 Rostock\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\"><\/td>\n<td>Germany\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Phone:<\/td>\n<td>+49 381 6663 3300\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Fax:<\/td>\n<td>+49 381 6663 3339\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">E-mail:<\/td>\n<td>info@nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Internet:<\/td>\n<td>www.nordex-online.com\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">ISIN:<\/td>\n<td>DE000A0D6554\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">WKN:<\/td>\n<td>A0D655\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Indices:<\/td>\n<td>TecDAX\t<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">Listed:<\/td>\n<td>Regulierter Markt in Frankfurt (Prime Standard); Freiverkehr in Berlin, D\u00fcsseldorf, Hamburg, Hannover, M\u00fcnchen, Stuttgart\t<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td valign=\"top\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\" width=\"100%\"> <!--&gt;\n\n<tr>\t\t\t\t\n\n<td colspan=\"2\">\t\t\t\t<\/td>\n\n\t\t\t<\/tr>\n\n\n\n<tr>\t\n\n<td class=\"column_1\">End of News<\/td>\n\n\t\n\n<td class=\"column_2\">DGAP News-Service<\/td>\n\n<\/tr>\n\n<\/table>\n\n\n\n<table class=\"news_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\" width=\"100%\">\n\n<tr>\n\n<td>\n\n<hr>\n\n<\/td>\n\n<\/tr>\n\n\n\n<tr>\n\n<td align=\"left\">281845&nbsp;&nbsp;12.08.2014<\/td>\n\n<\/tr>\n\n<\/table>\n\n--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders 12.08.2014 \/ 09:05 Press release Nordex to build Polish wind farm \u00ab\u00a0Orla\u00a0\u00bbContract awarded for first construction phase \/ 37.5 MW wind farm to go into operation in 2015 Hamburg, 12 August 2014. Wind turbine manufacturer Nordex has been awarded a contract for the delivery and installation of nine [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-10389","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex to build Polish wind farm &#039;Orla&#039; - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex to build Polish wind farm &#039;Orla&#039;\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders 12.08.2014 \/ 09:05 Press release Nordex to build Polish wind farm \u00ab\u00a0Orla\u00a0\u00bbContract awarded for first construction phase \/ 37.5 MW wind farm to go into operation in 2015 Hamburg, 12 August 2014. Wind turbine manufacturer Nordex has been awarded a contract for the delivery and installation of nine [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2014-08-12T07:05:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-08-28T10:26:09+00:00\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex to build Polish wind farm &lsquo;Orla&rsquo;\",\"datePublished\":\"2014-08-12T07:05:13+00:00\",\"dateModified\":\"2023-08-28T10:26:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\"},\"wordCount\":529,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\",\"name\":\"Nordex to build Polish wind farm 'Orla' - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"datePublished\":\"2014-08-12T07:05:13+00:00\",\"dateModified\":\"2023-08-28T10:26:09+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex to build Polish wind farm &lsquo;Orla&rsquo;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex to build Polish wind farm 'Orla' - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex to build Polish wind farm 'Orla'","og_description":"Nordex SE \/ Key word(s): Incoming Orders 12.08.2014 \/ 09:05 Press release Nordex to build Polish wind farm \u00ab\u00a0Orla\u00a0\u00bbContract awarded for first construction phase \/ 37.5 MW wind farm to go into operation in 2015 Hamburg, 12 August 2014. Wind turbine manufacturer Nordex has been awarded a contract for the delivery and installation of nine [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/","og_site_name":"Nordex SE","article_published_time":"2014-08-12T07:05:13+00:00","article_modified_time":"2023-08-28T10:26:09+00:00","author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex to build Polish wind farm &lsquo;Orla&rsquo;","datePublished":"2014-08-12T07:05:13+00:00","dateModified":"2023-08-28T10:26:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/"},"wordCount":529,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/","url":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/","name":"Nordex to build Polish wind farm 'Orla' - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"datePublished":"2014-08-12T07:05:13+00:00","dateModified":"2023-08-28T10:26:09+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2014\/08\/nordex-to-build-polish-wind-farm-orla-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex to build Polish wind farm &lsquo;Orla&rsquo;"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=10389"}],"version-history":[{"count":550,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10389\/revisions"}],"predecessor-version":[{"id":30304,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10389\/revisions\/30304"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=10389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=10389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=10389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}