{"id":10288,"date":"2017-01-12T10:40:41","date_gmt":"2017-01-12T10:40:41","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/"},"modified":"2023-11-28T15:06:43","modified_gmt":"2023-11-28T15:06:43","slug":"nordex-supplies-22-large-turbines-to-australia-2","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/","title":{"rendered":"Nordex supplies 22 large turbines to Australia"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p><span class=\"news_top_date\">12.01.2017 \/ 11:40 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr>\n<div class=\"break-word news_main\">\n<p><B>PRESS RELEASE<br \/><\/B><\/p>\n<p><b>Nordex supplies 22 large turbines to Australia <\/p>\n<p>Hamburg, 12 January 2017.<\/b> Uptrend Down Under: End of 2016 the Nordex Group has signed a contract for supplying 22 AW125\/3000 turbines for the construction of the first phase of \u00ab\u00a0Mount Gellibrand\u00a0\u00bb wind farm in Australia. This 66 MW project is located near Colac, in Western Victoria state, in the south-east of the country. The customer is the Spanish project developer Acciona Energia. This is the first Australian project for the Nordex Group since the acquisition of the Spanish wind turbine manufacturer Acciona Windpower in April 2016. At the moment there are two wind farms with the AW1500 platform in operation in Australia, with a total of 238.5 MW. This new contract has already been included in the 2016 order intake of EUR 3.3 billion Euro reported by the Nordex Group yesterday.<\/p>\n<p>Victoria is one of the states with the greatest potential for wind power in Australia. At the \u00ab\u00a0Mount Gellibrand\u00a0\u00bb site, some 100 kilometres south-west of Melbourne, there are average annual wind speeds of 7.2 m\/s. The turbines are especially designed for sites like this with medium wind speeds (IEC 2b) and a low turbulence level. Nordex will be installing the AW125\/3000 turbines on 87.5 metre tubular steel towers, which will be built in Victoria. Start-up of the wind farm is scheduled for 2018, after which Nordex will service the turbines for an initial period of two years.<\/p>\n<p><b>The Nordex  Group &#8211; a profile<br \/><\/b>The Group has installed around 20 GW of wind energy capacity in over 25 markets. In 2015 Nordex and Acciona Windpower generated combined revenues of EUR 3.4 billion. The company currently employs a workforce of around 5,000. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States and India. The product portfolio is focused on onshore turbines in the 1.5 to 3.6 MW class, which are tailor-made for the market requirements in developed and emerging markets.<\/p>\n<p><u>For more information, please contact:<\/u><br \/><u><br \/><\/u>Nordex SE<br \/>Felix Losada<br \/>Phone: 040 \/ 300 30 &#8211; 1000<\/p>\n<\/div>\n<p><\/p>\n<hr>\n<p class=\"news_bottom\">12.01.2017  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td class=\"first_column column_1\">Language:<\/td>\n<td class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Company:<\/td>\n<td class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Phone:<\/td>\n<td class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Fax:<\/td>\n<td class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">E-mail:<\/td>\n<td class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Internet:<\/td>\n<td class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">ISIN:<\/td>\n<td class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">WKN:<\/td>\n<td class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Indices:<\/td>\n<td class=\"column_2\">TecDAX<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Listed:<\/td>\n<td class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 12.01.2017 \/ 11:40 The issuer is solely responsible for the content of this announcement. PRESS RELEASE Nordex supplies 22 large turbines to Australia Hamburg, 12 January 2017. Uptrend Down Under: End of 2016 the Nordex Group has signed a contract for supplying 22 AW125\/3000 turbines for the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-10288","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex supplies 22 large turbines to Australia - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex supplies 22 large turbines to Australia\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 12.01.2017 \/ 11:40 The issuer is solely responsible for the content of this announcement. PRESS RELEASE Nordex supplies 22 large turbines to Australia Hamburg, 12 January 2017. Uptrend Down Under: End of 2016 the Nordex Group has signed a contract for supplying 22 AW125\/3000 turbines for the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2017-01-12T10:40:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-28T15:06:43+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex supplies 22 large turbines to Australia\",\"datePublished\":\"2017-01-12T10:40:41+00:00\",\"dateModified\":\"2023-11-28T15:06:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/\"},\"wordCount\":435,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/public-cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/\",\"name\":\"Nordex supplies 22 large turbines to Australia - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/public-cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2017-01-12T10:40:41+00:00\",\"dateModified\":\"2023-11-28T15:06:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#primaryimage\",\"url\":\"http:\\\/\\\/public-cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"http:\\\/\\\/public-cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2017\\\/01\\\/nordex-supplies-22-large-turbines-to-australia-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex supplies 22 large turbines to Australia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex supplies 22 large turbines to Australia - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex supplies 22 large turbines to Australia","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 12.01.2017 \/ 11:40 The issuer is solely responsible for the content of this announcement. PRESS RELEASE Nordex supplies 22 large turbines to Australia Hamburg, 12 January 2017. Uptrend Down Under: End of 2016 the Nordex Group has signed a contract for supplying 22 AW125\/3000 turbines for the [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/","og_site_name":"Nordex SE","article_published_time":"2017-01-12T10:40:41+00:00","article_modified_time":"2023-11-28T15:06:43+00:00","og_image":[{"url":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex supplies 22 large turbines to Australia","datePublished":"2017-01-12T10:40:41+00:00","dateModified":"2023-11-28T15:06:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/"},"wordCount":435,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#primaryimage"},"thumbnailUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/","url":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/","name":"Nordex supplies 22 large turbines to Australia - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#primaryimage"},"thumbnailUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data","datePublished":"2017-01-12T10:40:41+00:00","dateModified":"2023-11-28T15:06:43+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#primaryimage","url":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data","contentUrl":"http:\/\/public-cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=535897&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2017\/01\/nordex-supplies-22-large-turbines-to-australia-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex supplies 22 large turbines to Australia"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=10288"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10288\/revisions"}],"predecessor-version":[{"id":11239,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10288\/revisions\/11239"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=10288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=10288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=10288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}