{"id":10141,"date":"2020-06-03T05:30:02","date_gmt":"2020-06-03T05:30:02","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/"},"modified":"2023-11-28T15:06:25","modified_gmt":"2023-11-28T15:06:25","slug":"nordex-se-nordex-group-posts-brazil-order-for-90-mw","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/","title":{"rendered":"Nordex SE:  Nordex Group posts Brazil order for 90 MW"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<br \/><span class=\"news_top_date\">03.06.2020 \/ 07:30 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<div class=\"break-word news_main\">\n<p><b>Hamburg, 3. Juni 2020.<\/b> The Nordex Group has received an order from its new customer, COPEL &#8211; Companhia Paranaense de Energia, for the supply and construction of 26 AW132\/3465 turbines in Brazil. The order also includes the Servicing of the machines, with a contract term of 20 years.<\/p>\n<p>The 90 MW wind farm \u00ab\u00a0Janda\u00edra Copel\u00a0\u00bb will be built in the state of Rio Grande do Norte, near the city of Janda\u00edra in eastern Brazil. The Nordex Group will manufacture the 26 turbines at its production facility in Sim\u00f5es Filho. The turbines will be built on 120 metre concrete towers, which the Group will manufacture at its local plant in Areia Branca, not far from the site. The company will also source the rotor blades locally. Completion of the wind farm is planned for 2022.<\/p>\n<p>The order from COPEL &#8211; Companhia Paranaense de Energia is the first to be received by the Nordex Group and the second from a public utility in Brazil.<\/p>\n<p><b>Copel &#8211; Companhia Paranaense de Energia &#8211; a profile<\/b><br \/>Copel &#8211; Companhia Paranaense de Energia &#8211; generates, transmits, distributes and trades electric energy, and also provides telecommunication services. The Company is one of the largest electric power facilities in Brazil. The Company&rsquo;s position in the sector is a result of 65 years of experience and technical proficiency in generating, transmitting, distributing and commercializating electric power.<\/p>\n<p>Copel went public in April 1994 on Bolsa de Valores de S\u00e3o Paulo &#8211; B3 &#8211; and, in July 1997, became the first company of the Brazilian electric power sector with shares traded on the New York Stock Exchange. Copel&rsquo;s shares are also traded in Europe, on the Latibex &#8211; the Latin American arm of the Madrid Stock Exchange, since June 2002. In May 2008 Copel joined B3&rsquo;s Level 1 of Corporate Governance.<\/p>\n<p>Currently, Copel directly serves 4.6 million customers units in 395 municipalities and 1,113 localities (districts, villas and villages). Copel has 46 own plants (20 hydroelectric power plants, 1 thermal power plant and 25 wind farms), operates 1 hydroelectric power plants under the quota regime, and holds interests in another eleven energy generation projects (1 thermal power plant, 6 hydroelectric power plants and 4 wind power plants) in operation, totaling an installed capacity of 6,298 MW, referred to Copel&rsquo;s stake. In addition, 01 hydroelectric power plant and 01 wind farm is under construction. In order to transmit and distribute the generated energy, the Company has 6,783 km of transmission lines and 199,953 km of distribution lines, making up Brazil&rsquo;s third largest distribution network. Its workforce is composed of 7,095 employees.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>The Group has installed more than 28 GW of wind power capacity in over 40 markets and generated sales of around EUR 3.3 billion in 2019. The company currently has more than 7,500 employees. The Group&rsquo;s manufacturing network includes factories in Germany, Spain, Brazil, the USA, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><br \/>Nordex SE<br \/>Felix Losada<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>Nordex SE<br \/>Felix Zander<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\" target=\"_blank\" rel=\"noopener\">fzander@nordex-online.com<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">03.06.2020  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" class=\"first_column column_1\" nowrap>Language:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Company:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Phone:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Fax:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>E-mail:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Internet:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>ISIN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>WKN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Indices:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">Listed:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">1060879<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">End of News<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders03.06.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 3. Juni 2020. The Nordex Group has received an order from its new customer, COPEL &#8211; Companhia Paranaense de Energia, for the supply and construction of 26 AW132\/3465 turbines in Brazil. The order [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-10141","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group posts Brazil order for 90 MW - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group posts Brazil order for 90 MW\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders03.06.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 3. Juni 2020. The Nordex Group has received an order from its new customer, COPEL &#8211; Companhia Paranaense de Energia, for the supply and construction of 26 AW132\/3465 turbines in Brazil. The order [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-03T05:30:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-28T15:06:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group posts Brazil order for 90 MW\",\"datePublished\":\"2020-06-03T05:30:02+00:00\",\"dateModified\":\"2023-11-28T15:06:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/\"},\"wordCount\":645,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/\",\"name\":\"Nordex SE: Nordex Group posts Brazil order for 90 MW - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2020-06-03T05:30:02+00:00\",\"dateModified\":\"2023-11-28T15:06:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/2020\\\/06\\\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group posts Brazil order for 90 MW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/fr\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group posts Brazil order for 90 MW - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex Group posts Brazil order for 90 MW","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders03.06.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 3. Juni 2020. The Nordex Group has received an order from its new customer, COPEL &#8211; Companhia Paranaense de Energia, for the supply and construction of 26 AW132\/3465 turbines in Brazil. The order [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/","og_site_name":"Nordex SE","article_published_time":"2020-06-03T05:30:02+00:00","article_modified_time":"2023-11-28T15:06:25+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group posts Brazil order for 90 MW","datePublished":"2020-06-03T05:30:02+00:00","dateModified":"2023-11-28T15:06:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/"},"wordCount":645,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/","url":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/","name":"Nordex SE: Nordex Group posts Brazil order for 90 MW - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data","datePublished":"2020-06-03T05:30:02+00:00","dateModified":"2023-11-28T15:06:25+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1060879&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/06\/nordex-se-nordex-group-posts-brazil-order-for-90-mw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group posts Brazil order for 90 MW"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=10141"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10141\/revisions"}],"predecessor-version":[{"id":11817,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10141\/revisions\/11817"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=10141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=10141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=10141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}