{"id":10124,"date":"2020-10-27T06:30:03","date_gmt":"2020-10-27T06:30:03","guid":{"rendered":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/"},"modified":"2023-11-28T15:06:23","modified_gmt":"2023-11-28T15:06:23","slug":"nordex-se-nordex-group-wins-order-in-usa-for-240-mw","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/","title":{"rendered":"Nordex SE: Nordex Group wins order in USA for 240 MW"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders\/Product Launch<br \/><span class=\"news_top_date\">27.10.2020 \/ 07:30 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<div class=\"break-word news_main\">\n<p style=\"margin-left:40px\"><b>&#8211; <\/b>First order in the US for N155\/4.X Delta4000 turbines<\/p>\n<p style=\"margin-left:40px\">&#8211; The Nordex Group now also offers this turbine type with an increased rating of more than 5 MW: the N155\/5.X<\/p>\n<p><b>Hamburg, 27 October 2020. <\/b>The Nordex Group has won an order for a 240 MW wind farm in Texas, USA to be installed in 2021. The project will be supplied with 50 N155\/4.X turbines of the Delta4000 series and will operate with a rated power of 4.8 MW per wind turbine.<\/p>\n<p>The project and customer are undisclosed.<\/p>\n<p>With a 155 meter rotor diameter, the N155\/4.X turbines are ideally suited to the site conditions of the project which enables the customer to achieve a low cost of energy.<\/p>\n<p>\u00ab\u00a0We are pleased to once again deliver Delta4000 turbines to the USA. The wind farm will be the 10th Nordex Group project in South Texas. This brings our installed volume in this region to almost 1.9 gigawatts,\u00a0\u00bb says Patxi Landa, CSO of the Nordex Group.<\/p>\n<p>The turbine N155\/4.X, a variant of the Delta4000 series, is especially suitable for regions with lower turbulence and medium wind speeds. It is also suited to sites which are not subject to strict regulatory requirements for sound emissions. This applies to locations in large parts of the United States, Latin America, South Africa and Spain.<\/p>\n<p>In addition to the N155\/4.X, the Nordex Group now also offers the new rotor as an N155\/5.X in the 5MW segment. The N155\/5.X leverages already developed components of the current 5.X series &#8211; the N149\/5.X and the N163\/5.X &#8211; to boost annual energy production per wind turbine. This variant improves competitiveness in certain wind conditions or in situations where fewer wind turbines on a grid-constrained project result in a better overall cost of energy.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>The Group has installed more than 29 GW of wind energy capacity in over 40 markets and in 2019 generated revenues of EUR 3.3 billion. The company currently employs a workforce of approx. 7,900. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><br \/>Nordex SE<br \/>Felix Losada<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>Nordex SE<br \/>Felix Zander<br \/>Phone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\" target=\"_blank\" rel=\"noopener\">fzander@nordex-online.com<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">27.10.2020  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" class=\"first_column column_1\" nowrap>Language:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Company:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\"><\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Phone:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Fax:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>E-mail:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Internet:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>ISIN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>WKN:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>Indices:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">Listed:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\" nowrap>EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">1143112<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" class=\"column_1\">End of News<\/td>\n<td align=\"left\" valign=\"top\" class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders\/Product Launch27.10.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; First order in the US for N155\/4.X Delta4000 turbines &#8211; The Nordex Group now also offers this turbine type with an increased rating of more than 5 MW: the N155\/5.X Hamburg, 27 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-10124","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group wins order in USA for 240 MW - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group wins order in USA for 240 MW\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders\/Product Launch27.10.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; First order in the US for N155\/4.X Delta4000 turbines &#8211; The Nordex Group now also offers this turbine type with an increased rating of more than 5 MW: the N155\/5.X Hamburg, 27 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-27T06:30:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-28T15:06:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group wins order in USA for 240 MW\",\"datePublished\":\"2020-10-27T06:30:03+00:00\",\"dateModified\":\"2023-11-28T15:06:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\"},\"wordCount\":532,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\",\"name\":\"Nordex SE: Nordex Group wins order in USA for 240 MW - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2020-10-27T06:30:03+00:00\",\"dateModified\":\"2023-11-28T15:06:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group wins order in USA for 240 MW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/fr\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group wins order in USA for 240 MW - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/","og_locale":"fr_FR","og_type":"article","og_title":"Nordex SE: Nordex Group wins order in USA for 240 MW","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders\/Product Launch27.10.2020 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; First order in the US for N155\/4.X Delta4000 turbines &#8211; The Nordex Group now also offers this turbine type with an increased rating of more than 5 MW: the N155\/5.X Hamburg, 27 [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/","og_site_name":"Nordex SE","article_published_time":"2020-10-27T06:30:03+00:00","article_modified_time":"2023-11-28T15:06:23+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"aeckert","Dur\u00e9e de lecture estim\u00e9e":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group wins order in USA for 240 MW","datePublished":"2020-10-27T06:30:03+00:00","dateModified":"2023-11-28T15:06:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/"},"wordCount":532,"publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/","url":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/","name":"Nordex SE: Nordex Group wins order in USA for 240 MW - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data","datePublished":"2020-10-27T06:30:03+00:00","dateModified":"2023-11-28T15:06:23+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1143112&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/fr\/2020\/10\/nordex-se-nordex-group-wins-order-in-usa-for-240-mw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group wins order in USA for 240 MW"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/fr\/#website","url":"https:\/\/www.nordex-online.com\/fr\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/fr\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/6\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.nordex-online.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/fr\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/comments?post=10124"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10124\/revisions"}],"predecessor-version":[{"id":11800,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/posts\/10124\/revisions\/11800"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/media?parent=10124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/categories?post=10124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/fr\/wp-json\/wp\/v2\/tags?post=10124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}