{"id":5361,"date":"2022-04-13T05:30:03","date_gmt":"2022-04-13T05:30:03","guid":{"rendered":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/"},"modified":"2025-08-14T06:49:53","modified_gmt":"2025-08-14T06:49:53","slug":"nordex-se-nordex-group-receives-order-for-131-mw-from-peru","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/","title":{"rendered":"Nordex SE: Nordex Group receives order for 131 MW from Peru"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p>13.04.2022 \/ 07:30 <\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><strong>Hamburg, 13 April 2022.<\/strong> End of March, the Spanish project developer Acciona Energ\u00eda placed an order with the Nordex Group for 131 MW in Peru.\u00a0\u00a0<\/p>\n<p>The Nordex Group will supply 23 N163\/5.X turbines from the Delta4000 series for the \u00abSan Juan de Marcona\u00bb wind farm. The project is the first order from Peru for this type of turbine with a rotor diameter of 163 meters and a flexible rated output in the 5 MW class.\u00a0<\/p>\n<p>Acciona Energ\u00eda is taking charge of transport and installation. Commissioning of the turbines on tubular steel towers with a hub height of 148 meters is to be undertaken by the end of 2023.\u00a0<\/p>\n<p>The project will be built near San Juan de Marcona, the capital of the Marcona District of Nazca Province, which is located in the Ica region in the south-west of Peru.\u00a0\u00a0<\/p>\n<p>Average wind speeds in excess of 9 m\/s at the site near to the Pacific coast ensure that the 131 MW wind farm will produce a large amount of electricity.\u00a0\u00a0<\/p>\n<p>For the Nordex Group this is the third order from Peru. The first wind farm in the country with 132 MW was completed by the Nordex Group in 2018. A further wind farm with 177 MW is currently under construction.\u00a0\u00a0<\/p>\n<p><strong>The Nordex Group &#8211; a profile\u00a0<\/strong><\/p>\n<p>The Nordex Group has installed more than 39 GW of wind capacity in over 40 markets and in 2021 generated revenues of EUR 5.4 billion. The company currently employs a workforce of approx. 8,600. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, and Mexico. The product portfolio is focused on onshore wind turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.\u00a0<\/p>\n<p>Contact for press:\u00a0<br \/>\nNordex SE\u00a0<br \/>\nFelix Losada\u00a0<br \/>\nTelefon: +49 (0)40 \/ 300 30 &#8211; 1141\u00a0<br \/>\nflosada@nordex-online.com\u00a0\u00a0<\/p>\n<p>Contact for investors:\u00a0<br \/>\nNordex SE\u00a0<br \/>\nFelix Zander\u00a0<br \/>\nTelefon: +49 (0) 40 \/ 300 30 &#8211; 1116 \u00a0<br \/>\nfzander@nordex-online.com\u00a0<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n13.04.2022  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1326473<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1326473\u00a0\u00a013.04.2022\u00a0\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders 13.04.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 13 April 2022. End of March, the Spanish project developer Acciona Energ\u00eda placed an order with the Nordex Group for 131 MW in Peru.\u00a0\u00a0 The Nordex Group will supply 23 N163\/5.X turbines from [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[1092,1090],"tags":[],"class_list":["post-5361","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group receives order for 131 MW from Peru - Nordex SE - Espa\u00f1ol<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group receives order for 131 MW from Peru\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders 13.04.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 13 April 2022. End of March, the Spanish project developer Acciona Energ\u00eda placed an order with the Nordex Group for 131 MW in Peru.\u00a0\u00a0 The Nordex Group will supply 23 N163\/5.X turbines from [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE - Espa\u00f1ol\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-13T05:30:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:49:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group receives order for 131 MW from Peru\",\"datePublished\":\"2022-04-13T05:30:03+00:00\",\"dateModified\":\"2025-08-14T06:49:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\"},\"wordCount\":437,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporativo\",\"Relaciones con los inversores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\",\"url\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\",\"name\":\"Nordex SE: Nordex Group receives order for 131 MW from Peru - Nordex SE - Espa\u00f1ol\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2022-04-13T05:30:03+00:00\",\"dateModified\":\"2025-08-14T06:49:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group receives order for 131 MW from Peru\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE - Espa\u00f1ol\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/es\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group receives order for 131 MW from Peru - Nordex SE - Espa\u00f1ol","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/","og_locale":"es_ES","og_type":"article","og_title":"Nordex SE: Nordex Group receives order for 131 MW from Peru","og_description":"Nordex SE \/ Key word(s): Incoming Orders 13.04.2022 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 13 April 2022. End of March, the Spanish project developer Acciona Energ\u00eda placed an order with the Nordex Group for 131 MW in Peru.\u00a0\u00a0 The Nordex Group will supply 23 N163\/5.X turbines from [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/","og_site_name":"Nordex SE - Espa\u00f1ol","article_published_time":"2022-04-13T05:30:03+00:00","article_modified_time":"2025-08-14T06:49:53+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"aeckert","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group receives order for 131 MW from Peru","datePublished":"2022-04-13T05:30:03+00:00","dateModified":"2025-08-14T06:49:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/"},"wordCount":437,"publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporativo","Relaciones con los inversores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/","url":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/","name":"Nordex SE: Nordex Group receives order for 131 MW from Peru - Nordex SE - Espa\u00f1ol","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2022-04-13T05:30:03+00:00","dateModified":"2025-08-14T06:49:53+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1326473&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/es\/2022\/04\/nordex-se-nordex-group-receives-order-for-131-mw-from-peru\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/es\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group receives order for 131 MW from Peru"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/es\/#website","url":"https:\/\/www.nordex-online.com\/es\/","name":"Nordex SE - Espa\u00f1ol","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/es\/#organization","name":"Nordex SE - Espa\u00f1ol","url":"https:\/\/www.nordex-online.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE - Espa\u00f1ol"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/es\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/comments?post=5361"}],"version-history":[{"count":3,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5361\/revisions"}],"predecessor-version":[{"id":36955,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5361\/revisions\/36955"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/media?parent=5361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/categories?post=5361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/tags?post=5361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}