{"id":5025,"date":"2021-11-30T06:30:11","date_gmt":"2021-11-30T06:30:11","guid":{"rendered":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/"},"modified":"2025-08-14T06:49:54","modified_gmt":"2025-08-14T06:49:54","slug":"nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/","title":{"rendered":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW  <\/p>\n<p>30.11.2021 \/ 07:30 <\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div><b>&#8211; <\/b>65 N163\/5.X turbines of the Delta4000 series intended for the \u00abCaju\u00edna 2\u00bb wind farm<\/p>\n<p><b>Hamburg, 30 November 2021<\/b>. AES Brasil has once again commissioned the Nordex Group to supply and install N163\/5.X turbines in Brazil. Following the 314 MW order for the \u00abCaju\u00edna\u00bb wind farm in June 2021, AES has now ordered a further 65 N163\/5.X turbines with a total volume of 370 MW for the \u00abCaju\u00edna 2\u00bb extension phase. The order again includes service for the turbines for an initial period of five years, with several options to extend up to 20 years.<\/p>\n<p>\u00abCaju\u00edna 2\u00bb is part of the Caju\u00edna Wind Complex in the state of Rio Grande do Norte in the municipality of Lajes. Constant average wind speeds of approx. 9.5 m\/s give the site a high capacity factor.<\/p>\n<p>The turbines are due to be installed in summer 2022 and will be supplied in a project-specific operating mode of 5.7 MW. The Nordex Group will be manufacturing hubs, most parts of the nacelles, the 120 meter concrete towers and the rotor blades in Brazil.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 37 GW of wind energy capacity in over 40 markets and in 2020 generated revenues of EUR 4.6 billion. The company currently employs a workforce of approx. 8,500. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>Contact person for press:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><u>fzander@nordex-online.com<\/u><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n30.11.2021  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1252568<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1252568\u00a0\u00a030.11.2021\u00a0\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW 30.11.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; 65 N163\/5.X turbines of the Delta4000 series intended for the \u00abCaju\u00edna 2\u00bb wind farm Hamburg, 30 November 2021. [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[1092,1090],"tags":[],"class_list":["post-5025","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW - Nordex SE - Espa\u00f1ol<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW 30.11.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; 65 N163\/5.X turbines of the Delta4000 series intended for the \u00abCaju\u00edna 2\u00bb wind farm Hamburg, 30 November 2021. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE - Espa\u00f1ol\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-30T06:30:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:49:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW\",\"datePublished\":\"2021-11-30T06:30:11+00:00\",\"dateModified\":\"2025-08-14T06:49:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/\"},\"wordCount\":426,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\",\"articleSection\":[\"Corporativo\",\"Relaciones con los inversores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/\",\"name\":\"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW - Nordex SE - Espa\u00f1ol\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\",\"datePublished\":\"2021-11-30T06:30:11+00:00\",\"dateModified\":\"2025-08-14T06:49:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2021\\\/11\\\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE - Espa\u00f1ol\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW - Nordex SE - Espa\u00f1ol","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/","og_locale":"es_ES","og_type":"article","og_title":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW 30.11.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. &#8211; 65 N163\/5.X turbines of the Delta4000 series intended for the \u00abCaju\u00edna 2\u00bb wind farm Hamburg, 30 November 2021. [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/","og_site_name":"Nordex SE - Espa\u00f1ol","article_published_time":"2021-11-30T06:30:11+00:00","article_modified_time":"2025-08-14T06:49:54+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"aeckert","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW","datePublished":"2021-11-30T06:30:11+00:00","dateModified":"2025-08-14T06:49:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/"},"wordCount":426,"publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio","articleSection":["Corporativo","Relaciones con los inversores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/","url":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/","name":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW - Nordex SE - Espa\u00f1ol","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio","datePublished":"2021-11-30T06:30:11+00:00","dateModified":"2025-08-14T06:49:54+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1252568&amp;application_name=news&amp;site_id=airport_minio"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/es\/2021\/11\/nordex-se-nordex-group-receives-another-order-in-brazil-from-aes-brasil-for-370-mw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/es\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group receives another order in Brazil from AES Brasil for 370 MW"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/es\/#website","url":"https:\/\/www.nordex-online.com\/es\/","name":"Nordex SE - Espa\u00f1ol","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/es\/#organization","name":"Nordex SE - Espa\u00f1ol","url":"https:\/\/www.nordex-online.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE - Espa\u00f1ol"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/es\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/comments?post=5025"}],"version-history":[{"count":3,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5025\/revisions"}],"predecessor-version":[{"id":36973,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/5025\/revisions\/36973"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/media?parent=5025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/categories?post=5025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/tags?post=5025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}