{"id":4512,"date":"2021-05-19T05:30:05","date_gmt":"2021-05-19T05:30:05","guid":{"rendered":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/"},"modified":"2025-08-14T06:49:55","modified_gmt":"2025-08-14T06:49:55","slug":"nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/","title":{"rendered":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland <\/p>\n<p>19.05.2021 \/ 07:30 <\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 19 May 2021.<\/b> Energiequelle, an international wind farm developer, has once again commissioned the Nordex Group to supply and install turbines in Finland. As of mid-2023, the Nordex Group is to supply eight N163\/5.X turbines for the 45.6 MW \u00abLumivaara\u00bb project. The order also includes a Premium Service agreement for the turbines with a term of 30 years.<\/p>\n<p>The \u00abLumivaara\u00bb wind farm will be built in the municipality of Hyrynsalmi in Kainuu, a region in the north-east of Finland. The Nordex Group will supply the N163 turbines in the project-specific 5.7 MW operating mode. The machines will be configured in the cold-climate version for operation at temperatures down to -30 C and equipped with the Nordex Advanced Anti-Icing System for the rotor blades.<\/p>\n<p>\u00abWe are delighted that Energiequelle has again opted for our N163 turbines for the Lumivaara project. Thanks to the anti-icing system it will be possible to continue operating the turbines even in the harsh and icy winter conditions on site as the system prevents ice formation on the rotor blades,\u00bb says Patxi Landa, CSO of the Nordex Group.<\/p>\n<p>\u00abWith a project as demanding as Lumivaara, it is of the utmost importance that we can utilize turbine technology that is optimally designed for harsh climatic conditions. In addition, it was crucial for us to select with Nordex a manufacturer that has a well-established service network in the region and can thus ensure optimal operation of the turbines,\u00bb comments Nils Borstelmann, CEO of Energiequelle Oy.<\/p>\n<p>\u00abLumivaara\u00bb is the third order from Energiequelle placed in the course of this year. In April 2021, the international project developer placed an order with the Nordex Group for the supply and installation of the \u00abTakanebacken\u00bb and \u00abTorvenkyl\u00e4\u00bb wind farms, totalling 68 MW. These two orders also include a Premium Service contract for the turbines for a period of 30 years.<\/p>\n<p><b>About Energiequelle<\/b><br \/>\nEnergiequelle GmbH has been operating internationally as a project planner and operator of wind energy, biomass and photovoltaic systems as well as transformer stations and energy storage since 1997. The company has its headquarters in Kallinchen near Berlin, with other facilities in Bremen, Oldenburg, Hanover, Putlitz, Penzing, Erfurt, Dresden, Rostock, Leipzig, Guntersblum as well as in Rennes, Dijon and Royan (France) and Helsinki (Finland). With over 300 employees and more than 750 installed systems with a total output of approx. 1,400 MW, Energiequelle is a leading company in the sector.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 35 GW of wind energy capacity in over 40 markets and in 2020 generated revenues of EUR 4.6 billion. The company currently employs a workforce of approx. 8,500. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><b>Nordex SE<\/b><br \/><u>Contact person for press questions:<\/u><br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\">fzander@nordex-online.com<\/a><\/p>\n<p><b>Energiequelle GmbH<\/b><br \/><u>Contact person for press questions:<\/u><br \/>\nSusanne Tauke<br \/>\nMarketing &amp; PR<br \/>\nPhone: +49 (421) 62 67 69 22<br \/><a href=\"mailto:tauke@energiequelle.de\">tauke@energiequelle.de<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n19.05.2021  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1198006<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1198006\u00a0\u00a019.05.2021\u00a0\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland 19.05.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 19 May 2021. Energiequelle, an international wind farm developer, has once again commissioned the Nordex Group to supply and [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[1092,1090],"tags":[],"class_list":["post-4512","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland - Nordex SE - Espa\u00f1ol<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland 19.05.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 19 May 2021. Energiequelle, an international wind farm developer, has once again commissioned the Nordex Group to supply and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE - Espa\u00f1ol\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-19T05:30:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:49:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland\",\"datePublished\":\"2021-05-19T05:30:05+00:00\",\"dateModified\":\"2025-08-14T06:49:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\"},\"wordCount\":659,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\",\"articleSection\":[\"Corporativo\",\"Relaciones con los inversores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\",\"url\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\",\"name\":\"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland - Nordex SE - Espa\u00f1ol\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\",\"datePublished\":\"2021-05-19T05:30:05+00:00\",\"dateModified\":\"2025-08-14T06:49:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE - Espa\u00f1ol\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/es\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland - Nordex SE - Espa\u00f1ol","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/","og_locale":"es_ES","og_type":"article","og_title":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland 19.05.2021 \/ 07:30 The issuer is solely responsible for the content of this announcement. Hamburg, 19 May 2021. Energiequelle, an international wind farm developer, has once again commissioned the Nordex Group to supply and [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/","og_site_name":"Nordex SE - Espa\u00f1ol","article_published_time":"2021-05-19T05:30:05+00:00","article_modified_time":"2025-08-14T06:49:55+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"aeckert","Tiempo de lectura":"3 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland","datePublished":"2021-05-19T05:30:05+00:00","dateModified":"2025-08-14T06:49:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/"},"wordCount":659,"publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio","articleSection":["Corporativo","Relaciones con los inversores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/","url":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/","name":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland - Nordex SE - Espa\u00f1ol","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio","datePublished":"2021-05-19T05:30:05+00:00","dateModified":"2025-08-14T06:49:55+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1198006&amp;application_name=news&amp;site_id=airport_minio"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/es\/2021\/05\/nordex-se-energiequelle-places-order-with-the-nordex-group-for-45-mw-in-finland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/es\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Energiequelle places order with the Nordex Group for 45 MW in Finland"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/es\/#website","url":"https:\/\/www.nordex-online.com\/es\/","name":"Nordex SE - Espa\u00f1ol","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/es\/#organization","name":"Nordex SE - Espa\u00f1ol","url":"https:\/\/www.nordex-online.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE - Espa\u00f1ol"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/es\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/4512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/comments?post=4512"}],"version-history":[{"count":3,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/4512\/revisions"}],"predecessor-version":[{"id":37000,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/4512\/revisions\/37000"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/media?parent=4512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/categories?post=4512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/tags?post=4512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}