{"id":36366,"date":"2020-08-31T05:30:04","date_gmt":"2020-08-31T05:30:04","guid":{"rendered":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/"},"modified":"2026-04-13T15:07:11","modified_gmt":"2026-04-13T15:07:11","slug":"nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/","title":{"rendered":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>\nDGAP-Media \/ 31.08.2020 \/ 07:30 <\/p>\n<div>\n<p>&#8211; First N149 turbine installed at the 475 MW Nys\u00e4ter project in Sweden<\/p>\n<p><b>Hamburg, 31 August 2020.<\/b> On 28 August 2020, the Nordex Group installed the first of 114 turbines for the Nys\u00e4ter project in Sweden after completion of the necessary infrastructure work. At the end of 2018, the Group received a contract for the turnkey construction of 104 N149\/4.0-4.5 turbines and 10 N131\/3900 turbines from RWE Renewables, consisting of two separate sites \u00abH\u00e4stkullen\u00bb and \u00abBj\u00f6rnlandh\u00f6jden\u00bb and including civil and electrical infrastructure works. Nys\u00e4ter is currently the largest project of the Nordex Group in Europe.<\/p>\n<p>The Nys\u00e4ter project is being constructed across a large area of mainly forested land in county V\u00e4sternorrland, central Sweden. The sites are characterized by average wind speeds of between 7.5 and 8.0 meters per second. Since the wind conditions and the complex topography within the site are very different, the N149\/4.0-4.5 turbines have been configured using various tower heights and operational modes, in order to optimise the project economics and operational lifetime. The first turbine to be erected at the \u00abH\u00e4stkullen\u00bb site is the N149 turbine from the Delta4000 platform, which is installed on a 145 metre tubular steel tower.<\/p>\n<p>\u00abThe installation of the first turbine at H\u00e4stkullen marks an important milestone for the Nys\u00e4ter project and is the result of many months of hard work and strong cooperation amongst a wide range of stakeholders. We would like to thank all parties involved in bringing the project this far and we are looking forward to a continued safe and successful execution of this remarkable project\u00bb, says Tim Carpenter, Vice President region Nordic of the Nordex Group.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 29 GW of wind energy capacity in over 40 markets and in 2019 generated revenues of EUR 3.3 billion. The company currently employs a workforce of approx. 7,900. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\">fzander@nordex-online.com<\/a><\/p>\n<\/div>\n<p>End of Media Release<\/p>\n<hr \/>\n<p>Issuer: Nordex SE<br \/>\nKey word(s): Energy<\/p>\n<p>\n31.08.2020  Dissemination of a Press Release, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1124973<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP Media<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1124973\u00a0\u00a031.08.2020\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-Media \/ 31.08.2020 \/ 07:30 &#8211; First N149 turbine installed at the 475 MW Nys\u00e4ter project in Sweden Hamburg, 31 August 2020. On 28 August 2020, the Nordex Group installed the first of 114 turbines for the Nys\u00e4ter project in Sweden after completion of the necessary infrastructure work. At the end of 2018, the Group [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[6,1090],"tags":[],"class_list":["post-36366","post","type-post","status-publish","format-standard","hentry","category-press","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe - Nordex SE - Espa\u00f1ol<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe\" \/>\n<meta property=\"og:description\" content=\"DGAP-Media \/ 31.08.2020 \/ 07:30 &#8211; First N149 turbine installed at the 475 MW Nys\u00e4ter project in Sweden Hamburg, 31 August 2020. On 28 August 2020, the Nordex Group installed the first of 114 turbines for the Nys\u00e4ter project in Sweden after completion of the necessary infrastructure work. At the end of 2018, the Group [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE - Espa\u00f1ol\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-31T05:30:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-13T15:07:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe\",\"datePublished\":\"2020-08-31T05:30:04+00:00\",\"dateModified\":\"2026-04-13T15:07:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/\"},\"wordCount\":508,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\",\"articleSection\":[\"Comunicado de prensa\",\"Relaciones con los inversores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/\",\"name\":\"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe - Nordex SE - Espa\u00f1ol\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\",\"datePublished\":\"2020-08-31T05:30:04+00:00\",\"dateModified\":\"2026-04-13T15:07:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/2020\\\/08\\\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#organization\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/07\\\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE - Espa\u00f1ol\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/es\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe - Nordex SE - Espa\u00f1ol","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/","og_locale":"es_ES","og_type":"article","og_title":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe","og_description":"DGAP-Media \/ 31.08.2020 \/ 07:30 &#8211; First N149 turbine installed at the 475 MW Nys\u00e4ter project in Sweden Hamburg, 31 August 2020. On 28 August 2020, the Nordex Group installed the first of 114 turbines for the Nys\u00e4ter project in Sweden after completion of the necessary infrastructure work. At the end of 2018, the Group [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/","og_site_name":"Nordex SE - Espa\u00f1ol","article_published_time":"2020-08-31T05:30:04+00:00","article_modified_time":"2026-04-13T15:07:11+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"aeckert","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe","datePublished":"2020-08-31T05:30:04+00:00","dateModified":"2026-04-13T15:07:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/"},"wordCount":508,"publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio","articleSection":["Comunicado de prensa","Relaciones con los inversores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/","url":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/","name":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe - Nordex SE - Espa\u00f1ol","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio","datePublished":"2020-08-31T05:30:04+00:00","dateModified":"2026-04-13T15:07:11+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1124973&amp;application_name=news&amp;site_id=airport_minio"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/es\/2020\/08\/nordex-se-nordex-group-commences-turbine-installation-at-its-largest-wind-farm-in-europe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/es\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group commences turbine installation at its largest wind farm in Europe"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/es\/#website","url":"https:\/\/www.nordex-online.com\/es\/","name":"Nordex SE - Espa\u00f1ol","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/es\/#organization","name":"Nordex SE - Espa\u00f1ol","url":"https:\/\/www.nordex-online.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE - Espa\u00f1ol"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/es\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/36366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/comments?post=36366"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/36366\/revisions"}],"predecessor-version":[{"id":36367,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/36366\/revisions\/36367"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/media?parent=36366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/categories?post=36366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/tags?post=36366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}