{"id":3014,"date":"2009-10-21T09:30:00","date_gmt":"2009-10-21T09:30:00","guid":{"rendered":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/"},"modified":"2025-08-14T06:49:10","modified_gmt":"2025-08-14T06:49:10","slug":"nordex-china-supplying-33-mw-for-ningxia-power","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/","title":{"rendered":"Nordex China supplying 33 MW for Ningxia Power"},"content":{"rendered":"<p><STRONG>Contract for the first versions of the 82-meter rotor model awarded by key-account customer<\/STRONG> <P><P><P>Hamburg, October 21, 2009. Nordex has been awarded two new contracts in the high-growth Chinese market. Starting in November, it will be supplying 22 1.5 MW multi-megawatt turbines for the \u201cSunhill II\u201d and \u201cHongsipu II\u201d wind farms for utility Ningxia Electric Power. Some of the turbines will also be fitted with rotors with a new enlarged diameter of 82 meters. The Nordex S82\/1500 is a new version of the proven 1.5 MW platform specially designed for use in non-coastal regions. <\/P><P>Nordex will install the \u201cSunhill II\u201d wind farm with a nominal capacity of 28.5 MW and the \u201cHongsipu II\u201d project (4.5 MW) near Yinchuan in the province of Ningxia. With rotor diameters of 77 and 82 meters, the turbines will be capable of producing an annual yield of 70 gigawatt\/hours. \u201cBoth systems incorporate technology which has proven itself in 700 installations all around the world. We are producing them directly at our facilities in Yinchuan and Dongying and sourcing nearly all components from Chinese partners in the interests of maximizing local content,\u201d explains Carsten Pedersen, COO Sales and Marketing at Nordex. The 22 turbines are to go on line this year. <\/P><P>All told, Nordex has installed approximately 120 MW for Ningxia Electric Power to date. The most recent project was the S77\/1500 wind farm \u201cSunhill I\u201d, which has been on line since August. Nordex is currently showcasing the new S82\/1500 at the China Windpower fair in Peking (October 21 &#8211; 23). <\/P><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract for the first versions of the 82-meter rotor model awarded by key-account customer Hamburg, October 21, 2009. Nordex has been awarded two new contracts in the high-growth Chinese market. Starting in November, it will be supplying 22 1.5 MW multi-megawatt turbines for the \u201cSunhill II\u201d and \u201cHongsipu II\u201d wind farms for utility Ningxia Electric [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[6,1090],"tags":[],"class_list":["post-3014","post","type-post","status-publish","format-standard","hentry","category-press","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex China supplying 33 MW for Ningxia Power - Nordex SE - Espa\u00f1ol<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex China supplying 33 MW for Ningxia Power\" \/>\n<meta property=\"og:description\" content=\"Contract for the first versions of the 82-meter rotor model awarded by key-account customer Hamburg, October 21, 2009. Nordex has been awarded two new contracts in the high-growth Chinese market. Starting in November, it will be supplying 22 1.5 MW multi-megawatt turbines for the \u201cSunhill II\u201d and \u201cHongsipu II\u201d wind farms for utility Ningxia Electric [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE - Espa\u00f1ol\" \/>\n<meta property=\"article:published_time\" content=\"2009-10-21T09:30:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:49:10+00:00\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex China supplying 33 MW for Ningxia Power\",\"datePublished\":\"2009-10-21T09:30:00+00:00\",\"dateModified\":\"2025-08-14T06:49:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\"},\"wordCount\":247,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"articleSection\":[\"Comunicado de prensa\",\"Relaciones con los inversores\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\",\"url\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\",\"name\":\"Nordex China supplying 33 MW for Ningxia Power - Nordex SE - Espa\u00f1ol\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\"},\"datePublished\":\"2009-10-21T09:30:00+00:00\",\"dateModified\":\"2025-08-14T06:49:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex China supplying 33 MW for Ningxia Power\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#organization\",\"name\":\"Nordex SE - Espa\u00f1ol\",\"url\":\"https:\/\/www.nordex-online.com\/es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE - Espa\u00f1ol\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/es\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex China supplying 33 MW for Ningxia Power - Nordex SE - Espa\u00f1ol","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/","og_locale":"es_ES","og_type":"article","og_title":"Nordex China supplying 33 MW for Ningxia Power","og_description":"Contract for the first versions of the 82-meter rotor model awarded by key-account customer Hamburg, October 21, 2009. Nordex has been awarded two new contracts in the high-growth Chinese market. Starting in November, it will be supplying 22 1.5 MW multi-megawatt turbines for the \u201cSunhill II\u201d and \u201cHongsipu II\u201d wind farms for utility Ningxia Electric [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/","og_site_name":"Nordex SE - Espa\u00f1ol","article_published_time":"2009-10-21T09:30:00+00:00","article_modified_time":"2025-08-14T06:49:10+00:00","author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"aeckert","Tiempo de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex China supplying 33 MW for Ningxia Power","datePublished":"2009-10-21T09:30:00+00:00","dateModified":"2025-08-14T06:49:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/"},"wordCount":247,"publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"articleSection":["Comunicado de prensa","Relaciones con los inversores"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/","url":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/","name":"Nordex China supplying 33 MW for Ningxia Power - Nordex SE - Espa\u00f1ol","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/es\/#website"},"datePublished":"2009-10-21T09:30:00+00:00","dateModified":"2025-08-14T06:49:10+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/es\/2009\/10\/nordex-china-supplying-33-mw-for-ningxia-power\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/es\/"},{"@type":"ListItem","position":2,"name":"Nordex China supplying 33 MW for Ningxia Power"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/es\/#website","url":"https:\/\/www.nordex-online.com\/es\/","name":"Nordex SE - Espa\u00f1ol","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/es\/#organization","name":"Nordex SE - Espa\u00f1ol","url":"https:\/\/www.nordex-online.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/4\/2024\/07\/cropped-cropped-Combined-Logos_cmyk_PNG.png","width":1181,"height":353,"caption":"Nordex SE - Espa\u00f1ol"},"image":{"@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.nordex-online.com\/es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/es\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/3014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/comments?post=3014"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/3014\/revisions"}],"predecessor-version":[{"id":3687,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/posts\/3014\/revisions\/3687"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/media?parent=3014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/categories?post=3014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/es\/wp-json\/wp\/v2\/tags?post=3014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}