{"id":51425,"date":"2020-09-14T05:30:12","date_gmt":"2020-09-14T05:30:12","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/"},"modified":"2026-04-08T11:05:04","modified_gmt":"2026-04-08T11:05:04","slug":"nordex-se-nordex-group-first-n149-5-x-installed-as-planned","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/","title":{"rendered":"Nordex SE: Nordex Group: first N149\/5.X installed as planned"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>\nDGAP-Media \/ 14.09.2020 \/ 07:30 <\/p>\n<div>\n<p><b>&#8211; <\/b>Preparation of the measuring and validation programme for type certification<\/p>\n<p><b>Hamburg, 14 September 2020<\/b>. On 8 September the Nordex Group installed the first N149\/5.X turbine in the Genshagener Heide wind farm near Potsdam, Germany. In spring 2019 the Nordex Group had opened the market segment for 5 MW turbines with this turbine type. This month the first N149\/5.X will start operation on schedule. Following the installation of the turbine, preparation commences for the measuring and validation programme for the type certification of the N149\/5.X.<\/p>\n<p>With mean wind speeds 6.4 m\/s at the hub height of 105 metres the site offers good conditions for measuring the 5.7 MW turbine. In addition to the power curve, the Nordex Group will be validating the sound power level and grid compatibility of the turbine on the basis of the measurements recorded in the field. This means that for the start of the series production in 2021 the turbine will be fully certified, including the type certificate.<\/p>\n<p>The N149\/5.X is a logical progression based on the successful approach of a flexible rating of the N149\/4.0-4.5. The turbine is designed for maximum flexibility and can be operated in different modes in the 5 MW range, depending on site requirements and customer needs. A new and highly efficient gearbox is used and the electrical system of the Delta4000 series scaled up in order to achieve the high power output in the 5 MW range.<\/p>\n<p>To date the Nordex Group has already received orders for 800 MW for the N149\/5.X since its launch last year.<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><br \/>\nThe Group has installed more than 29 GW of wind energy capacity in over 40 markets and in 2019 generated revenues of EUR 3.3 billion. The company currently employs a workforce of approx. 7,900. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>For more information, please contact:<\/u><br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1141<br \/><u>flosada@nordex-online.com<\/u><\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 (0)40 \/ 300 30 &#8211; 1116<br \/><a href=\"mailto:fzander@nordex-online.com\">fzander@nordex-online.com<\/a><\/p>\n<\/div>\n<p>End of Media Release<\/p>\n<hr \/>\n<p>Issuer: Nordex SE<br \/>\nKey word(s): Energy<\/p>\n<p>\n14.09.2020  Dissemination of a Press Release, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1130595<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">DGAP Media<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1130595\u00a0\u00a014.09.2020\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-Media \/ 14.09.2020 \/ 07:30 &#8211; Preparation of the measuring and validation programme for type certification Hamburg, 14 September 2020. On 8 September the Nordex Group installed the first N149\/5.X turbine in the Genshagener Heide wind farm near Potsdam, Germany. In spring 2019 the Nordex Group had opened the market segment for 5 MW turbines [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[41,6],"tags":[],"class_list":["post-51425","post","type-post","status-publish","format-standard","hentry","category-investor-relations","category-press"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group: first N149\/5.X installed as planned - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group: first N149\/5.X installed as planned\" \/>\n<meta property=\"og:description\" content=\"DGAP-Media \/ 14.09.2020 \/ 07:30 &#8211; Preparation of the measuring and validation programme for type certification Hamburg, 14 September 2020. On 8 September the Nordex Group installed the first N149\/5.X turbine in the Genshagener Heide wind farm near Potsdam, Germany. In spring 2019 the Nordex Group had opened the market segment for 5 MW turbines [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-14T05:30:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-08T11:05:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group: first N149\\\/5.X installed as planned\",\"datePublished\":\"2020-09-14T05:30:12+00:00\",\"dateModified\":\"2026-04-08T11:05:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/\"},\"wordCount\":485,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\",\"articleSection\":[\"Investor Relations\",\"Press Releases\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/\",\"name\":\"Nordex SE: Nordex Group: first N149\\\/5.X installed as planned - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\",\"datePublished\":\"2020-09-14T05:30:12+00:00\",\"dateModified\":\"2026-04-08T11:05:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2020\\\/09\\\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group: first N149\\\/5.X installed as planned\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group: first N149\/5.X installed as planned - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/","og_locale":"en_US","og_type":"article","og_title":"Nordex SE: Nordex Group: first N149\/5.X installed as planned","og_description":"DGAP-Media \/ 14.09.2020 \/ 07:30 &#8211; Preparation of the measuring and validation programme for type certification Hamburg, 14 September 2020. On 8 September the Nordex Group installed the first N149\/5.X turbine in the Genshagener Heide wind farm near Potsdam, Germany. In spring 2019 the Nordex Group had opened the market segment for 5 MW turbines [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/","og_site_name":"Nordex SE","article_published_time":"2020-09-14T05:30:12+00:00","article_modified_time":"2026-04-08T11:05:04+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aeckert","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group: first N149\/5.X installed as planned","datePublished":"2020-09-14T05:30:12+00:00","dateModified":"2026-04-08T11:05:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/"},"wordCount":485,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio","articleSection":["Investor Relations","Press Releases"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/","url":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/","name":"Nordex SE: Nordex Group: first N149\/5.X installed as planned - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio","datePublished":"2020-09-14T05:30:12+00:00","dateModified":"2026-04-08T11:05:04+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1130595&amp;application_name=news&amp;site_id=airport_minio"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2020\/09\/nordex-se-nordex-group-first-n149-5-x-installed-as-planned\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group: first N149\/5.X installed as planned"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/en\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/51425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=51425"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/51425\/revisions"}],"predecessor-version":[{"id":51426,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/51425\/revisions\/51426"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=51425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=51425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=51425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}