{"id":5046,"date":"2018-01-15T15:39:36","date_gmt":"2018-01-15T15:39:36","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/"},"modified":"2023-11-28T15:03:15","modified_gmt":"2023-11-28T15:03:15","slug":"falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/","title":{"rendered":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden"},"content":{"rendered":"<table class=\"news_layout style2015\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td>\n<p class=\"news_top\">DGAP-News: Nordex SE \/ Key word(s): Incoming Orders<\/p>\n<p><span class=\"news_top_date\">15.01.2018 \/ 16:39 <\/span><br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div class=\"break-word news_main\">\n<p>&nbsp;<\/p>\n<p><b>Falck Renewables and Nordex start the year with a 115 MW order for Sweden <\/b><\/p>\n<p><b>Hamburg, Milan, 15 January 2018.<\/b> Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts to supply in total 31 N131\/3900 wind turbines and the associated civil and electrical infrastructure works on an EPC turn-key basis for the two Swedish projects &#8220;Aliden&#8221; and &#8220;Brattmyrliden&#8221;. Preliminary works have started with activity intensifying during 2018 and 2019 respectively. Commercial operations are expected in Q4 2019 at &#8220;Aliden&#8221; and Q4 2020 at &#8220;Brattmyrliden&#8221;.<\/p>\n<p>The two wind farms are located in V\u00e4sterbotten, around 100 kilometres west of Umea. The companies have chosen the latest stage available technology of Nordex suitable for these sites characterized by mean wind speeds of 7.6 &#8211; 7.8 m\/s. The turbines, specifically designed for local site conditions, have a maximum rated capacity of 3.9 MW each and are on 134-metre towers with NR65.5 blades. The turbines are equipped with cold climate packages with the Nordex Anti-icing System installed on the rotor blades that allow the two wind farms to achieve an above-average net capacity factor of approximately 40%, expected to generate approximately 420 GWh of energy per year.<\/p>\n<p>Toni Volpe, CEO of Falck Renewables declared: &#8220;We are very satisfied with this agreement with Nordex, a long standing partner for Falck. The terms and turbines of this contract are absolutely a prime example of how to optimize the technology choice and work cooperatively to reduce the LCOE of a windfarm. We look forward to the continuation of the works.&#8221;<\/p>\n<p>***<\/p>\n<p><b>About Falck Renewables S.p.A<\/b>., listed in the STAR segment of the Italian Stock Exchange, develops, designs, builds and manages power production plants from renewable sources. With an installed capacity of 950 MW in 2017 (913 MW according to the IFRS 11 reclassification) produces more than two billion kwh per year in Italy, United Kingdom, Spain, France and USA, using wind, solar, biomass, and waste-to-energy technologies. The Group is also active in the service business where it manages over 1,700 MW of solar and wind assets and provides technical services across the world.&#8221;<\/p>\n<p><b>About the Nordex Group<\/b><br \/>The Group has installed wind power capacity of more than 21 GW in over 25 markets, generating sales of EUR 3.4 billion in 2016. It currently has roughly 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 &#8211; 4.5 MW class addressing the requirements of land constrained as well as grid constrained markets.<\/p>\n<p><u><i>For information about Falck Renewables please contact: <\/i><\/u><br \/><i>Giorgio BOTTA &#8211; Investor Relation &#8211; tel.02.2433.3338<br \/>Alessandra RUZZU &#8211; Media Relations &#8211; Tel. 02.2433.2360<br \/>SEC SPA &#8211; Tel. 02.6249991<br \/>Marco Fraquelli, Fabio Leoni, Fabio Santilio <\/i><\/p>\n<p><u><i>For more information about Nordex, please contact:<\/i><\/u><br \/><i>Nordex SE<br \/>Ralf Peters<br \/>Telephone: + 49 40 300 30 &#8211; 1000<\/i><br \/><a href=\"mailto:rpeters@nordex-online.com\" target=\"_blank\" rel=\"noopener\">rpeters@nordex-online.com<\/a><\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p class=\"news_bottom\">15.01.2018  Dissemination of a Corporate News, transmitted by DGAP &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The DGAP Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases. <br \/>Archive at www.dgap.de<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table class=\"news_footer_layout\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td class=\"first_column column_1\" nowrap>Language:<\/td>\n<td class=\"column_2\">English<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Company:<\/td>\n<td class=\"column_2\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\"><\/td>\n<td class=\"column_2\">Germany<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Phone:<\/td>\n<td class=\"column_2\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Fax:<\/td>\n<td class=\"column_2\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>E-mail:<\/td>\n<td class=\"column_2\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Internet:<\/td>\n<td class=\"column_2\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>ISIN:<\/td>\n<td class=\"column_2\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>WKN:<\/td>\n<td class=\"column_2\">A0D655<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\" nowrap>Indices:<\/td>\n<td class=\"column_2\">TecDAX<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">Listed:<\/td>\n<td class=\"column_2\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table class=\"news_footer_layout\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\"><\/td>\n<\/tr>\n<\/table>\n<table class=\"news_layout news_layout_footer_end\" border=\"0\" cellpadding=\"0\" cellspacing=\"0\">\n<tr>\n<td colspan=\"2\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td class=\"column_1\">End of News<\/td>\n<td class=\"column_2\">DGAP News Service<\/td>\n<\/tr>\n<\/table>\n<p class=\"\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\" alt=\"show this\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 15.01.2018 \/ 16:39 The issuer is solely responsible for the content of this announcement. &nbsp; Falck Renewables and Nordex start the year with a 115 MW order for Sweden Hamburg, Milan, 15 January 2018. Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-5046","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Falck Renewables and Nordex start the year with a 115 MW order for Sweden - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Falck Renewables and Nordex start the year with a 115 MW order for Sweden\" \/>\n<meta property=\"og:description\" content=\"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 15.01.2018 \/ 16:39 The issuer is solely responsible for the content of this announcement. &nbsp; Falck Renewables and Nordex start the year with a 115 MW order for Sweden Hamburg, Milan, 15 January 2018. Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2018-01-15T15:39:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-28T15:03:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Falck Renewables and Nordex start the year with a 115 MW order for Sweden\",\"datePublished\":\"2018-01-15T15:39:36+00:00\",\"dateModified\":\"2023-11-28T15:03:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/\"},\"wordCount\":576,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/\",\"name\":\"Falck Renewables and Nordex start the year with a 115 MW order for Sweden - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\",\"datePublished\":\"2018-01-15T15:39:36+00:00\",\"dateModified\":\"2023-11-28T15:03:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#primaryimage\",\"url\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\",\"contentUrl\":\"https:\\\/\\\/link.cockpit.eqs.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2018\\\/01\\\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Falck Renewables and Nordex start the year with a 115 MW order for Sweden\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/","og_locale":"en_US","og_type":"article","og_title":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden","og_description":"DGAP-News: Nordex SE \/ Key word(s): Incoming Orders 15.01.2018 \/ 16:39 The issuer is solely responsible for the content of this announcement. &nbsp; Falck Renewables and Nordex start the year with a 115 MW order for Sweden Hamburg, Milan, 15 January 2018. Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/","og_site_name":"Nordex SE","article_published_time":"2018-01-15T15:39:36+00:00","article_modified_time":"2023-11-28T15:03:15+00:00","og_image":[{"url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aeckert","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden","datePublished":"2018-01-15T15:39:36+00:00","dateModified":"2023-11-28T15:03:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/"},"wordCount":576,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data","articleSection":["Corporate","Investor Relations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/","url":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/","name":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#primaryimage"},"thumbnailUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data","datePublished":"2018-01-15T15:39:36+00:00","dateModified":"2023-11-28T15:03:15+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#primaryimage","url":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data","contentUrl":"https:\/\/link.cockpit.eqs.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=645477&amp;application_name=news&amp;site_id=news_data"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2018\/01\/falck-renewables-and-nordex-start-the-year-with-a-115-mw-order-for-sweden\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Falck Renewables and Nordex start the year with a 115 MW order for Sweden"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/en\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/5046","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=5046"}],"version-history":[{"count":5,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/5046\/revisions"}],"predecessor-version":[{"id":42973,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/5046\/revisions\/42973"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=5046"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=5046"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=5046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}