{"id":48672,"date":"2024-07-16T05:30:13","date_gmt":"2024-07-16T05:30:13","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/"},"modified":"2025-08-14T06:38:58","modified_gmt":"2025-08-14T06:38:58","slug":"nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/","title":{"rendered":"Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Product Launch<\/p>\n<p><\/p>\n<p>Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany <\/p>\n<p>16.07.2024 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 16 July 2024.<\/b> On July 12<sup>th<\/sup>, the Nordex Group installed the world&#8217;s first N175\/6.X turbine at the B\u00fcrgerwindpark Janneby (community wind farm) in Schleswig-Holstein, Germany. With a rotor swept area of 24,053 square metres and a nominal capacity of up to 6.8 MW, the N175\/6.X is the most powerful Nordex turbine specifically for medium and light wind sites.<\/p>\n<p>The special feature of the turbine is the single-piece, approximately 86-metre-long rotor blade: both the rotor diameter of 175 metres and the new blade design make a significant contribution to very high performance, especially at light wind speeds.\u00a0\u00a0<\/p>\n<p>&#8220;The installation of the first N175\/6.X is an important milestone for Nordex. Our colleagues worked very hard and closely together to ensure the development and the installation on schedule of this pilot turbine. The N175\/6.X is another variant of our globally proven Delta4000 platform, using validated components. Thanks to the turbine&#8217;s large rotor, we will be setting new standards onshore in Germany and Europe in terms of additional electricity yield, especially at times of light wind speeds,&#8221; says Jos\u00e9 Luis Blanco, CEO of the Nordex Group.<\/p>\n<p>In the following months, the N175\/6.X will undergo extensive tests at the site. Nordex has already installed prototypes in Janneby in the past and has had good experience with the site. The on-site wind conditions provide excellent conditions for the required power and sound measurements and validation of mechanical loads for IEC type certification.\u00a0<\/p>\n<p>The Nordex Group has installed the N175\/6.X at its site in Schleswig-Holstein on a tubular steel tower with a hub height of 112 metres. A second N175\/6.X is to follow in Mecklenburg-Western Pomerania in late autumn 2024. Here, the turbine type will be installed on a hybrid tower developed by Nordex itself with a hub height of 179 metres, which is the tallest tower in the Nordex portfolio to date.\u00a0\u00a0<\/p>\n<p><b>\u00a0About the Nordex Group<\/b><\/p>\n<p>The Group has installed around 51 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 6.5 billion in 2023. The Company currently has more than 10,000 employees. The Group\u2019s manufacturing network includes factories in Germany, Spain, Brazil, India, USA and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.<\/p>\n<p>\u00a0<\/p>\n<p><u>Contact person for press<\/u>:<br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nTelephone: +49 (0) 40 30030 1141<br \/>\nE-mail: flosada@nordex-online.com<\/p>\n<p><u>Contact for investor inquiries:<\/u><br \/>\nNordex SE<br \/>\nAnja Siehler<br \/>\nPhone: +49 162 3515 334<br \/>\nE-mail: asiehler@nordex-online.com<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n16.07.2024 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">investor-relations@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1946407<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1946407\u00a0\u00a016.07.2024\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Product Launch Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany 16.07.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 16 July 2024. On July 12th, the Nordex Group installed the world&#8217;s first N175\/6.X turbine at the B\u00fcrgerwindpark Janneby (community wind farm) in [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-48672","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex Group installs world&#039;s first N175\/6.X turbine in Germany - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex Group installs world&#039;s first N175\/6.X turbine in Germany\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Product Launch Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany 16.07.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 16 July 2024. On July 12th, the Nordex Group installed the world&#8217;s first N175\/6.X turbine at the B\u00fcrgerwindpark Janneby (community wind farm) in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-16T05:30:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:38:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex Group installs world&#8217;s first N175\\\/6.X turbine in Germany\",\"datePublished\":\"2024-07-16T05:30:13+00:00\",\"dateModified\":\"2025-08-14T06:38:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/\"},\"wordCount\":568,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/\",\"name\":\"Nordex Group installs world's first N175\\\/6.X turbine in Germany - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2024-07-16T05:30:13+00:00\",\"dateModified\":\"2025-08-14T06:38:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/07\\\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex Group installs world&#8217;s first N175\\\/6.X turbine in Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex Group installs world's first N175\/6.X turbine in Germany - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/","og_locale":"en_US","og_type":"article","og_title":"Nordex Group installs world's first N175\/6.X turbine in Germany","og_description":"Nordex SE \/ Key word(s): Product Launch Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany 16.07.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 16 July 2024. On July 12th, the Nordex Group installed the world&#8217;s first N175\/6.X turbine at the B\u00fcrgerwindpark Janneby (community wind farm) in [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/","og_site_name":"Nordex SE","article_published_time":"2024-07-16T05:30:13+00:00","article_modified_time":"2025-08-14T06:38:58+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aeckert","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany","datePublished":"2024-07-16T05:30:13+00:00","dateModified":"2025-08-14T06:38:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/"},"wordCount":568,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporate","Investor Relations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/","url":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/","name":"Nordex Group installs world's first N175\/6.X turbine in Germany - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2024-07-16T05:30:13+00:00","dateModified":"2025-08-14T06:38:58+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1946407&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2024\/07\/nordex-group-installs-worlds-first-n175-6-x-turbine-in-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex Group installs world&#8217;s first N175\/6.X turbine in Germany"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/en\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=48672"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48672\/revisions"}],"predecessor-version":[{"id":51860,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48672\/revisions\/51860"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=48672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=48672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=48672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}