{"id":48590,"date":"2024-06-20T05:30:07","date_gmt":"2024-06-20T05:30:07","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/"},"modified":"2025-08-14T06:38:59","modified_gmt":"2025-08-14T06:38:59","slug":"nordex-group-receives-orders-for-172-mw-in-germany","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/","title":{"rendered":"Nordex Group receives orders for 172 MW in Germany\u00a0"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders\/Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex Group receives orders for 172 MW in Germany\u00a0 <\/p>\n<p>20.06.2024 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p>\u00a0<\/p>\n<p><b>Nordex Group receives orders for 172 MW in Germany<\/b><b>\u00a0 <\/b><\/p>\n<ul>\n<li><b>Operating group orders eleven N163\/6.X turbines<\/b><\/li>\n<\/ul>\n<p><b>Hamburg, 20. June 2024.<\/b> Order intake in the German market has once again developed well for the Nordex Group. Most recently, the Group received orders amounting to around 172 MW for various customers.<\/p>\n<p>The largest of the projects won is being built in Lower Saxony, with the Nordex Group supplying eleven N163\/6.X turbines to a wind farm operator from Badbergen\/Dinklage, in the districts of Osnabr\u00fcck and Vechta. The contract also includes a Premium Service contract with a twenty-year term. The 74.8 MW &#8220;B\u00fcnne-Wehdel&#8221; wind farm is scheduled for commissioning in fall 2025.<\/p>\n<p>B\u00fcnne-Wehdel is a repowering project in which 17 1.5 MW S\u00fcdwind S70 turbines on 114.5-metre lattice towers of the existing Badbergen-Dinklage wind farm will be replaced by eleven N163\/6.X turbines; these machines will each have a capacity of 6.8 MW with a hub height of 164 metres. The Nordex Group already produced, supplied, and installed the turbines under its former brand \u201cS\u00fcdwind\u201d 22 years ago.<\/p>\n<p>Karsten Br\u00fcggemann, Vice President Region Central of the Nordex Group: &#8220;The new 6.8 MW turbines are very efficient and offer a much higher annual yield than the old turbines. We are proud that we can make an important contribution to the energy transition with this repowering project, and especially that we can once again install turbines for the same operating group at this location after more than 20 years.&#8221;<\/p>\n<p>The project was planned jointly by EFI Wind from M\u00fclheim an der Ruhr and Alpha Wind from Osnabr\u00fcck, as well as the Bad Essen-based company Energy-Farming. The latter is also responsible for the commercial and technical operation of the wind farm.<\/p>\n<p>\u00a0<\/p>\n<p><b>About the Nordex Group<\/b><\/p>\n<p>The Group has installed around 51 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 6.5 billion in 2023. The Company currently has more than 10,000 employees. The Group\u2019s manufacturing network includes factories in Germany, Spain, Brazil, India, USA (mothballed) and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.<\/p>\n<p>\u00a0<\/p>\n<p><u>Contact person for press<\/u>:<br \/>\nNordex SE<br \/>\nFelix Losada<br \/>\nTelephone: +49 (0) 40 30030 1141<br \/>\nE-mail: flosada@nordex-online.com<\/p>\n<p><u>Contact for investor inquiries:<\/u><br \/>\nNordex SE<br \/>\nAnja Siehler<br \/>\nPhone: +49 162 3515 334<br \/>\nE-mail: asiehler@nordex-online.com<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n20.06.2024 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">investor-relations@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">MDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1929155<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1929155\u00a0\u00a020.06.2024\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders\/Incoming Orders Nordex Group receives orders for 172 MW in Germany\u00a0 20.06.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. \u00a0 Nordex Group receives orders for 172 MW in Germany\u00a0 Operating group orders eleven N163\/6.X turbines Hamburg, 20. June 2024. Order intake in [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-48590","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex Group receives orders for 172 MW in Germany\u00a0 - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex Group receives orders for 172 MW in Germany\u00a0\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders\/Incoming Orders Nordex Group receives orders for 172 MW in Germany\u00a0 20.06.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. \u00a0 Nordex Group receives orders for 172 MW in Germany\u00a0 Operating group orders eleven N163\/6.X turbines Hamburg, 20. June 2024. Order intake in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-20T05:30:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:38:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex Group receives orders for 172 MW in Germany\u00a0\",\"datePublished\":\"2024-06-20T05:30:07+00:00\",\"dateModified\":\"2025-08-14T06:38:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/\"},\"wordCount\":537,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/\",\"name\":\"Nordex Group receives orders for 172 MW in Germany\u00a0 - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2024-06-20T05:30:07+00:00\",\"dateModified\":\"2025-08-14T06:38:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\\\/\\\/eqs-cockpit.com\\\/cgi-bin\\\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-group-receives-orders-for-172-mw-in-germany\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex Group receives orders for 172 MW in Germany\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/antje\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex Group receives orders for 172 MW in Germany\u00a0 - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/","og_locale":"en_US","og_type":"article","og_title":"Nordex Group receives orders for 172 MW in Germany\u00a0","og_description":"Nordex SE \/ Key word(s): Incoming Orders\/Incoming Orders Nordex Group receives orders for 172 MW in Germany\u00a0 20.06.2024 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. \u00a0 Nordex Group receives orders for 172 MW in Germany\u00a0 Operating group orders eleven N163\/6.X turbines Hamburg, 20. June 2024. Order intake in [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/","og_site_name":"Nordex SE","article_published_time":"2024-06-20T05:30:07+00:00","article_modified_time":"2025-08-14T06:38:59+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aeckert","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex Group receives orders for 172 MW in Germany\u00a0","datePublished":"2024-06-20T05:30:07+00:00","dateModified":"2025-08-14T06:38:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/"},"wordCount":537,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporate","Investor Relations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/","url":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/","name":"Nordex Group receives orders for 172 MW in Germany\u00a0 - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2024-06-20T05:30:07+00:00","dateModified":"2025-08-14T06:38:59+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1929155&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-group-receives-orders-for-172-mw-in-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex Group receives orders for 172 MW in Germany\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/en\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=48590"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48590\/revisions"}],"predecessor-version":[{"id":51867,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48590\/revisions\/51867"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=48590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=48590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=48590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}