{"id":48573,"date":"2024-06-13T06:33:30","date_gmt":"2024-06-13T06:33:30","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/?p=48573"},"modified":"2024-06-13T06:33:31","modified_gmt":"2024-06-13T06:33:31","slug":"nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/","title":{"rendered":"Nordex exceeds 5 GW threshold for installations in the Nordics"},"content":{"rendered":"\n<p>Hamburg, 13 June 2024. With the installation of a N163\/5.X turbine at the Kalistanneva wind farm in Finland, the Nordex Group has now exceeded the 5 GW threshold of installed capacity in the Nordic region. A total of 1,234 turbines &#8220;Made by Nordex&#8221; are currently in operation in Denmark, Finland, Sweden and Norway and produce clean electricity for 2 million households. Distributed by country, 2.6 GW is accounted for by wind farms in Finland, 1.6 GW by parks in Sweden, 641 MW by parks in Norway and 152 MW by wind farms in Denmark.<\/p>\n\n\n\n<p>&#8220;The Nordic markets are often characterized by complex terrain, difficult site access, challenging climate conditions and high expectations for HSE management. Our customers know that we can master these challenges and, thanks to our cold climate variants and the Nordex Advanced Anti-Icing System, also offer proven solutions for high turbine availability in the long, demanding winter months,&#8221; says Till Junge, Vice President of the Nordex Group\u2019s Nordic region.<\/p>\n\n\n\n<p>The Nordex Group installed its first turbines in the region in Denmark in the mid-1980s. Today, Finland and Sweden are the drivers of new wind energy projects in the Nordics.<\/p>\n\n\n\n<p>&#8220;With our long track record and a strong and dedicated local team in the Nordics we are committed to support our customers in the region in the years ahead. Thanks to our large rotors, powerful turbines and high tower variants, we are in a good position to maintain our market position and continuously expand our installation base in the region,&#8221; adds Ibrahim \u00d6zarslan, CEO of Nordex Group\u2019s Division Europe.<\/p>\n\n\n\n<p>About the Nordex Group<\/p>\n\n\n\n<p>The Group has installed around 50 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 6.5 billion in 2023. The Company currently has more than 10,000 employees. The Group\u2019s manufacturing network includes factories in Germany, Spain, Brazil, India, USA (mothballed) and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with limited grid capacity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hamburg, 13 June 2024. With the installation of a N163\/5.X turbine at the Kalistanneva wind farm in Finland, the Nordex Group has now exceeded the 5 GW threshold of installed capacity in the Nordic region. A total of 1,234 turbines &#8220;Made by Nordex&#8221; are currently in operation in Denmark, Finland, Sweden and Norway and produce [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":48575,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[905],"tags":[],"class_list":["post-48573","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex exceeds 5 GW threshold for installations in the Nordics - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex exceeds 5 GW threshold for installations in the Nordics\" \/>\n<meta property=\"og:description\" content=\"Hamburg, 13 June 2024. With the installation of a N163\/5.X turbine at the Kalistanneva wind farm in Finland, the Nordex Group has now exceeded the 5 GW threshold of installed capacity in the Nordic region. A total of 1,234 turbines &#8220;Made by Nordex&#8221; are currently in operation in Denmark, Finland, Sweden and Norway and produce [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-13T06:33:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-13T06:33:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1443\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Losada, Felix\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Losada, Felix\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/\"},\"author\":{\"name\":\"Losada, Felix\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/55c351e379afa364550f317a2ed49f88\"},\"headline\":\"Nordex exceeds 5 GW threshold for installations in the Nordics\",\"datePublished\":\"2024-06-13T06:33:30+00:00\",\"dateModified\":\"2024-06-13T06:33:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/\"},\"wordCount\":351,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/06\\\/1000004802-V2-scaled.jpg\",\"articleSection\":[\"Company news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/\",\"name\":\"Nordex exceeds 5 GW threshold for installations in the Nordics - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/06\\\/1000004802-V2-scaled.jpg\",\"datePublished\":\"2024-06-13T06:33:30+00:00\",\"dateModified\":\"2024-06-13T06:33:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/06\\\/1000004802-V2-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/06\\\/1000004802-V2-scaled.jpg\",\"width\":2560,\"height\":1443},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2024\\\/06\\\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex exceeds 5 GW threshold for installations in the Nordics\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/55c351e379afa364550f317a2ed49f88\",\"name\":\"Losada, Felix\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g\",\"caption\":\"Losada, Felix\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/flosada\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex exceeds 5 GW threshold for installations in the Nordics - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/","og_locale":"en_US","og_type":"article","og_title":"Nordex exceeds 5 GW threshold for installations in the Nordics","og_description":"Hamburg, 13 June 2024. With the installation of a N163\/5.X turbine at the Kalistanneva wind farm in Finland, the Nordex Group has now exceeded the 5 GW threshold of installed capacity in the Nordic region. A total of 1,234 turbines &#8220;Made by Nordex&#8221; are currently in operation in Denmark, Finland, Sweden and Norway and produce [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/","og_site_name":"Nordex SE","article_published_time":"2024-06-13T06:33:30+00:00","article_modified_time":"2024-06-13T06:33:31+00:00","og_image":[{"width":2560,"height":1443,"url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg","type":"image\/jpeg"}],"author":"Losada, Felix","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Losada, Felix","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/"},"author":{"name":"Losada, Felix","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/55c351e379afa364550f317a2ed49f88"},"headline":"Nordex exceeds 5 GW threshold for installations in the Nordics","datePublished":"2024-06-13T06:33:30+00:00","dateModified":"2024-06-13T06:33:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/"},"wordCount":351,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg","articleSection":["Company news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/","url":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/","name":"Nordex exceeds 5 GW threshold for installations in the Nordics - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg","datePublished":"2024-06-13T06:33:30+00:00","dateModified":"2024-06-13T06:33:31+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#primaryimage","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/06\/1000004802-V2-scaled.jpg","width":2560,"height":1443},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2024\/06\/nordex-exceeds-5-gw-threshold-for-installations-in-the-nordics-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex exceeds 5 GW threshold for installations in the Nordics"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/55c351e379afa364550f317a2ed49f88","name":"Losada, Felix","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a5ebb61026b7e94f6c40e5f0489357cd086d32a53cd9595871c61860cce67a8e?s=96&d=mm&r=g","caption":"Losada, Felix"},"url":"https:\/\/www.nordex-online.com\/en\/author\/flosada\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=48573"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48573\/revisions"}],"predecessor-version":[{"id":48574,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/48573\/revisions\/48574"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media\/48575"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=48573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=48573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=48573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}