{"id":14242,"date":"2022-11-02T06:30:09","date_gmt":"2022-11-02T06:30:09","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/"},"modified":"2025-08-14T06:39:02","modified_gmt":"2025-08-14T06:39:02","slug":"nordex-se-nordex-group-wins-48-mw-order-in-poland","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/","title":{"rendered":"Nordex SE: Nordex Group wins 48 MW order in Poland"},"content":{"rendered":"<table border=\"0\">\n<tr>\n<td>\n<p>Nordex SE<\/p>\n<p> \/ Key word(s): Incoming Orders<\/p>\n<p><\/p>\n<p>Nordex SE: Nordex Group wins 48 MW order in Poland <\/p>\n<p>02.11.2022 \/ 07:30 CET\/CEST<\/p>\n<p>The issuer is solely responsible for the content of this announcement.<\/p>\n<hr \/>\n<div>\n<p><b>Hamburg, 2 November 2022.<\/b> Wind Energia Sp. z.o.o. has placed an order with the Nordex Group for the supply and installation of 16 N117\/3000 turbines for the 48 MW \u201cNozdrzec\u201d wind farm. The company is a subsidiary of Yevuley Shemesh (YVS) Renewable Energy Ltd., which operates in the field of renewable energy and is based in Israel. The order also includes a Premium Service for the turbines covering a period of 20 years.<\/p>\n<p>The \u201cNozdrzec\u201d wind farm is being built in the south-east of Poland in the province of Subcarpathia. The N117\/3000 turbines will be installed by the Nordex Group as of summer 2023 on tubular steel towers with a hub height of 134 metres. The final turbine is scheduled to go into operation at the end of 2023.<\/p>\n<p>Adam Ofek, YVS Cerac Management CEO says: \u201cSigning with Nordex this agreement in this challenging time is very important milestone for the success of our Nozdrzec wind farm development\u201d.<\/p>\n<p>Patxi Landa, CSO of the Nordex Group: &#8220;We are delighted that we are gaining more and more momentum in the Polish market and that we have now been able to win Yevuley Shemesh as a new customer for our Nordex technology.&#8221;<\/p>\n<p><b>The Nordex Group &#8211; a profile<\/b><\/p>\n<p>The Group has installed more than 41 GW of wind energy capacity in over 40 markets and in 2021 generated revenues of EUR 5.4 billion. The company currently employs a workforce of approx. 9,000. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India and Mexico. The product portfolio is focused on onshore turbines in the 4 to 6.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.<\/p>\n<p><u>Contact person for press:<\/u><\/p>\n<p>Nordex SE<br \/>\nFelix Losada<br \/>\nPhone: +49 (0) 40 30030 1141\u00a0<br \/>\nflosada@nordex-online.com<\/p>\n<p><u>Contact for investors:<\/u><br \/>\nNordex SE<br \/>\nFelix Zander<br \/>\nPhone: +49 1520 9024 029<br \/>\nfzander@nordex-online.com<\/p>\n<\/div>\n<p><\/p>\n<hr \/>\n<p>\n02.11.2022 CET\/CEST Dissemination of a Corporate News, transmitted by EQS News &#8211; a service of EQS Group AG.<br \/>The issuer is solely responsible for the content of this announcement.<\/p>\n<p>The EQS Distribution Services include Regulatory Announcements, Financial\/Corporate News and Press Releases.<br \/>Archive at www.eqs-news.com<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<table>\n<tr>\n<td align=\"left\" valign=\"top\">Language:<\/td>\n<td align=\"left\" valign=\"top\">English<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Company:<\/td>\n<td align=\"left\" valign=\"top\">Nordex SE<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Erich-Schlesinger-Stra\u00dfe 50<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">18059 Rostock<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\" \/>\n<td align=\"left\" valign=\"top\">Germany<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Phone:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3300<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Fax:<\/td>\n<td align=\"left\" valign=\"top\">+49 381 6663 3339<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">E-mail:<\/td>\n<td align=\"left\" valign=\"top\">info@nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Internet:<\/td>\n<td align=\"left\" valign=\"top\">www.nordex-online.com<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">ISIN:<\/td>\n<td align=\"left\" valign=\"top\">DE000A0D6554<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">WKN:<\/td>\n<td align=\"left\" valign=\"top\">A0D655<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Indices:<\/td>\n<td align=\"left\" valign=\"top\">SDAX, TecDAX<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">Listed:<\/td>\n<td align=\"left\" valign=\"top\">Regulated Market in Frankfurt (Prime Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Hamburg, Hanover, Munich, Stuttgart, Tradegate Exchange<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">EQS News ID:<\/td>\n<td align=\"left\" valign=\"top\">1476521<\/td>\n<\/tr>\n<\/table>\n<p><\/p>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\" \/>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td align=\"left\" valign=\"top\" colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"top\">End of News<\/td>\n<td align=\"left\" valign=\"top\">EQS News Service<\/td>\n<\/tr>\n<\/table>\n<table border=\"0\">\n<tr>\n<td>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<p>1476521\u00a0\u00a002.11.2022\u00a0CET\/CEST\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\" alt=\"fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\" width=\"0\" height=\"0\" border=\"0\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins 48 MW order in Poland 02.11.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 2 November 2022. Wind Energia Sp. z.o.o. has placed an order with the Nordex Group for the supply and installation of 16 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[43,41],"tags":[],"class_list":["post-14242","post","type-post","status-publish","format-standard","hentry","category-corporate","category-investor-relations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group wins 48 MW order in Poland - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group wins 48 MW order in Poland\" \/>\n<meta property=\"og:description\" content=\"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins 48 MW order in Poland 02.11.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 2 November 2022. Wind Energia Sp. z.o.o. has placed an order with the Nordex Group for the supply and installation of 16 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-02T06:30:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T06:39:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\" \/>\n<meta name=\"author\" content=\"aeckert\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"aeckert\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\"},\"author\":{\"name\":\"aeckert\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\"},\"headline\":\"Nordex SE: Nordex Group wins 48 MW order in Poland\",\"datePublished\":\"2022-11-02T06:30:09+00:00\",\"dateModified\":\"2025-08-14T06:39:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\"},\"wordCount\":443,\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\",\"articleSection\":[\"Corporate\",\"Investor Relations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\",\"url\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\",\"name\":\"Nordex SE: Nordex Group wins 48 MW order in Poland - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\",\"datePublished\":\"2022-11-02T06:30:09+00:00\",\"dateModified\":\"2025-08-14T06:39:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage\",\"url\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\",\"contentUrl\":\"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.nordex-online.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group wins 48 MW order in Poland\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#website\",\"url\":\"https:\/\/www.nordex-online.com\/en\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\/\/www.nordex-online.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95\",\"name\":\"aeckert\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g\",\"caption\":\"aeckert\"},\"url\":\"https:\/\/www.nordex-online.com\/en\/author\/antje\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group wins 48 MW order in Poland - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/","og_locale":"en_US","og_type":"article","og_title":"Nordex SE: Nordex Group wins 48 MW order in Poland","og_description":"Nordex SE \/ Key word(s): Incoming Orders Nordex SE: Nordex Group wins 48 MW order in Poland 02.11.2022 \/ 07:30 CET\/CEST The issuer is solely responsible for the content of this announcement. Hamburg, 2 November 2022. Wind Energia Sp. z.o.o. has placed an order with the Nordex Group for the supply and installation of 16 [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/","og_site_name":"Nordex SE","article_published_time":"2022-11-02T06:30:09+00:00","article_modified_time":"2025-08-14T06:39:02+00:00","og_image":[{"url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws","type":"","width":"","height":""}],"author":"aeckert","twitter_card":"summary_large_image","twitter_misc":{"Written by":"aeckert","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/"},"author":{"name":"aeckert","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95"},"headline":"Nordex SE: Nordex Group wins 48 MW order in Poland","datePublished":"2022-11-02T06:30:09+00:00","dateModified":"2025-08-14T06:39:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/"},"wordCount":443,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws","articleSection":["Corporate","Investor Relations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/","url":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/","name":"Nordex SE: Nordex Group wins 48 MW order in Poland - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage"},"thumbnailUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws","datePublished":"2022-11-02T06:30:09+00:00","dateModified":"2025-08-14T06:39:02+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#primaryimage","url":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws","contentUrl":"https:\/\/eqs-cockpit.com\/cgi-bin\/fncls.ssp?fn=show_t_gif&amp;application_id=1476521&amp;application_name=news&amp;site_id=airport_aws"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2022\/11\/nordex-se-nordex-group-wins-48-mw-order-in-poland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group wins 48 MW order in Poland"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/81621b8f0d2d2d605ac828cef137de95","name":"aeckert","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bb1da8fdca865f8714afd486408f3f4d26ef53f3ff2e44201e2a0a3b5e3c6b2?s=96&d=mm&r=g","caption":"aeckert"},"url":"https:\/\/www.nordex-online.com\/en\/author\/antje\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/14242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=14242"}],"version-history":[{"count":3,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/14242\/revisions"}],"predecessor-version":[{"id":51933,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/14242\/revisions\/51933"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=14242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=14242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=14242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}