{"id":13631,"date":"2022-05-18T10:37:00","date_gmt":"2022-05-18T10:37:00","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/?p=13631"},"modified":"2023-04-24T11:06:37","modified_gmt":"2023-04-24T11:06:37","slug":"nordex-se-nordex-group-installs-first-n163-6-x-turbine-2","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/","title":{"rendered":"Nordex SE: Nordex Group installs first N163\/6.X turbine"},"content":{"rendered":"\n<p>On the 18th of May 2022, the Nordex Group has installed the world\u2019s first N163\/6.X turbine in the Delta4000 series. As recently as September 2021 the company announced the launch of the N163\/6.X and thus its entry into the 6-MW class. The premiered turbine is now being installed as part of the installation work in the Zeebiestocht and Olsterwind wind farms in the province of Flevoland in the Netherlands, where a total of 15 turbines in this latest version are being installed.<br>Jos\u00e9 Luis Blanco, CEO Nordex Group: \u201cWe are pleased that we are right on schedule with the introduction and installation of our turbines in the 6 MW+ class. Like its sister model, the N163\/5.X, the N163\/6.X is designed for moderate and light-wind regions but focusses on selected core markets in Europe.\u201d<br>With its approx. 80-metre rotor blades and a rotor swept area of 20,867 square metres, the sound emission level of the N163\/6.X is 106.4 dB(A) which is despite the higher rating lower compared to its sister model N163\/5.X. Different tower variants depending on the market, with a height of up to 164 metres, a cold climate version and the Advanced Anti-Icing-System for rotor blades are also options for the N163\/6.X.<br>The start of series production of the N163\/6.X is scheduled for the beginning of 2023. Today the Nordex Group has received several orders for this turbine type, among others for the 380 MW wind farm cluster Pjelax-B\u00f6le-Kristinestad Norr in Finland as well as the orders for the two wind farms in the Netherlands totalling 102 MW.<br>In the coming months in Zeebiestocht the requisite power and noise measurements as well as validation of mechanical loads will be conducted for IEC type certification.<\/p>\n\n\n\n<p><strong>The Delta4000 series at a glance:<\/strong><\/p>\n\n\n\n<p>Turbines in the 6 MW segment:<br>N163\/6.X<br>Turbines in the 5 MW segment:<br>N149\/5.X<br>N155\/5.X<br>N163\/5.X<br>Turbines in the 4 MW segment:<br>N133\/4.8<br>N149\/4.X<br>N155\/4.X<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the 18th of May 2022, the Nordex Group has installed the world\u2019s first N163\/6.X turbine in the Delta4000 series. As recently as September 2021 the company announced the launch of the N163\/6.X and thus its entry into the 6-MW class. The premiered turbine is now being installed as part of the installation work in [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":13632,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[905],"tags":[],"class_list":["post-13631","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nordex SE: Nordex Group installs first N163\/6.X turbine - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nordex SE: Nordex Group installs first N163\/6.X turbine\" \/>\n<meta property=\"og:description\" content=\"On the 18th of May 2022, the Nordex Group has installed the world\u2019s first N163\/6.X turbine in the Delta4000 series. As recently as September 2021 the company announced the launch of the N163\/6.X and thus its entry into the 6-MW class. The premiered turbine is now being installed as part of the installation work in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-18T10:37:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:06:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png\" \/>\n\t<meta property=\"og:image:width\" content=\"654\" \/>\n\t<meta property=\"og:image:height\" content=\"433\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Lueske, Annkathrin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lueske, Annkathrin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/\"},\"author\":{\"name\":\"Lueske, Annkathrin\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/c4337f60eb01413422bc1da80e01eefa\"},\"headline\":\"Nordex SE: Nordex Group installs first N163\\\/6.X turbine\",\"datePublished\":\"2022-05-18T10:37:00+00:00\",\"dateModified\":\"2023-04-24T11:06:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/\"},\"wordCount\":324,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/06\\\/n163_6x.png\",\"articleSection\":[\"Company news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/\",\"name\":\"Nordex SE: Nordex Group installs first N163\\\/6.X turbine - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/06\\\/n163_6x.png\",\"datePublished\":\"2022-05-18T10:37:00+00:00\",\"dateModified\":\"2023-04-24T11:06:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/06\\\/n163_6x.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/06\\\/n163_6x.png\",\"width\":654,\"height\":433,\"caption\":\"Drone shot of the installation of a white Delta4000 wind turbine of the type N163\\\/6.X. On the right site a crane lifting the last rotor blade. In the background green fields.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2022\\\/05\\\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nordex SE: Nordex Group installs first N163\\\/6.X turbine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/c4337f60eb01413422bc1da80e01eefa\",\"name\":\"Lueske, Annkathrin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g\",\"caption\":\"Lueske, Annkathrin\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/alueske\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nordex SE: Nordex Group installs first N163\/6.X turbine - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/","og_locale":"en_US","og_type":"article","og_title":"Nordex SE: Nordex Group installs first N163\/6.X turbine","og_description":"On the 18th of May 2022, the Nordex Group has installed the world\u2019s first N163\/6.X turbine in the Delta4000 series. As recently as September 2021 the company announced the launch of the N163\/6.X and thus its entry into the 6-MW class. The premiered turbine is now being installed as part of the installation work in [&hellip;]","og_url":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/","og_site_name":"Nordex SE","article_published_time":"2022-05-18T10:37:00+00:00","article_modified_time":"2023-04-24T11:06:37+00:00","og_image":[{"width":654,"height":433,"url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png","type":"image\/png"}],"author":"Lueske, Annkathrin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lueske, Annkathrin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/"},"author":{"name":"Lueske, Annkathrin","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/c4337f60eb01413422bc1da80e01eefa"},"headline":"Nordex SE: Nordex Group installs first N163\/6.X turbine","datePublished":"2022-05-18T10:37:00+00:00","dateModified":"2023-04-24T11:06:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/"},"wordCount":324,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png","articleSection":["Company news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/","url":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/","name":"Nordex SE: Nordex Group installs first N163\/6.X turbine - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png","datePublished":"2022-05-18T10:37:00+00:00","dateModified":"2023-04-24T11:06:37+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#primaryimage","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2022\/06\/n163_6x.png","width":654,"height":433,"caption":"Drone shot of the installation of a white Delta4000 wind turbine of the type N163\/6.X. On the right site a crane lifting the last rotor blade. In the background green fields."},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2022\/05\/nordex-se-nordex-group-installs-first-n163-6-x-turbine-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Nordex SE: Nordex Group installs first N163\/6.X turbine"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/c4337f60eb01413422bc1da80e01eefa","name":"Lueske, Annkathrin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5f437cb50a62dc548338e5f2f7cdc9d3081c5843b1d3b99dd10c7595c4217fa4?s=96&d=mm&r=g","caption":"Lueske, Annkathrin"},"url":"https:\/\/www.nordex-online.com\/en\/author\/alueske\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/13631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=13631"}],"version-history":[{"count":1,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/13631\/revisions"}],"predecessor-version":[{"id":13633,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/13631\/revisions\/13633"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media\/13632"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=13631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=13631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=13631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}