{"id":11729,"date":"2021-05-31T13:52:33","date_gmt":"2021-05-31T13:52:33","guid":{"rendered":"https:\/\/www.nordex-online.com\/en\/?p=11729"},"modified":"2023-04-24T11:07:18","modified_gmt":"2023-04-24T11:07:18","slug":"norway-first-turbine-installed-on-oyfjellet","status":"publish","type":"post","link":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/","title":{"rendered":"Norway: First turbine installed on \u00d8yfjellet"},"content":{"rendered":"\n<p>On the 22nd of May, Nordex Group\u2019s Project Management team reached a major milestone on one of the company\u2019s biggest projects in the Nordic region, when the first wind turbine was installed on \u00d8yfjellet wind farm in Norway. This success is thanks to a committed local team who has been working hard despite difficult site conditions due to the long winter in Northern Norway where the site is located.<\/p>\n\n\n\n<p>The wind farm features N149\/5.X TS105 turbines which are manufactured in the Nordex production facilities in Europe. As a fun fact, the 1000th ever-produced nacelle of the Delta4000 series will be delivered to \u00d8yfjellet from our Rostock factory.<\/p>\n\n\n\n<p>The wind farm will consist of 72 turbines and the rest of these are planned to be installed and commissioned by the end of 2021. Pictured here is the lifting operation done with the main crane.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"335\" src=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/1st-WTG-Oyfj-1024x335.jpg\" alt=\"\" class=\"wp-image-11731\" srcset=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/1st-WTG-Oyfj-1024x335.jpg 1024w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/1st-WTG-Oyfj-300x98.jpg 300w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/1st-WTG-Oyfj-768x251.jpg 768w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/1st-WTG-Oyfj.jpg 1265w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption> Pictured components from left to right: tower section, nacelle, hub, blade and finally the complete turbine <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4-1024x577.jpg\" alt=\"\" class=\"wp-image-11732\" srcset=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4-1024x577.jpg 1024w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4-300x169.jpg 300w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4-768x432.jpg 768w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4-1536x865.jpg 1536w, https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/MicrosoftTeams-image-4.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption> Installations continue on the site and Nordex wishes the construction team a safe and successful continuation of the project! <\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:25%\">\n<p class=\"has-background has-text-align-left has-grey-10-background-color\"><strong><a href=\"https:\/\/www.nordex-online.com\/en\/nordics\/\">Back to: The Nordex Group in Sweden, Norway &amp; Finland<\/a><\/strong><\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On the 22nd of May, Nordex Group\u2019s Project Management team reached a major milestone on one of the company\u2019s biggest projects in the Nordic region, when the first wind turbine was installed on \u00d8yfjellet wind farm in Norway. This success is thanks to a committed local team who has been working hard despite difficult site&#8230;<\/p>\n<div class=\"wp-block-button is-style-underline\">\n<a href=\"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/\"><br \/>\n<span class=\"wp-block-button__link\"><br \/>\nRead more<br \/>\n<\/span><br \/>\n<\/a>\n<\/div>\n","protected":false},"author":17,"featured_media":11730,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"categories":[3105],"tags":[],"class_list":["post-11729","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-feed-nordics"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Norway: First turbine installed on \u00d8yfjellet - Nordex SE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Norway: First turbine installed on \u00d8yfjellet\" \/>\n<meta property=\"og:description\" content=\"On the 22nd of May, Nordex Group\u2019s Project Management team reached a major milestone on one of the company\u2019s biggest projects in the Nordic region, when the first wind turbine was installed on \u00d8yfjellet wind farm in Norway. This success is thanks to a committed local team who has been working hard despite difficult site...    Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/\" \/>\n<meta property=\"og:site_name\" content=\"Nordex SE\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-31T13:52:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-24T11:07:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1078\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Liljenberg, Robin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Liljenberg, Robin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/\"},\"author\":{\"name\":\"Liljenberg, Robin\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/ad1c876aa5735832f07a9659e6f81399\"},\"headline\":\"Norway: First turbine installed on \u00d8yfjellet\",\"datePublished\":\"2021-05-31T13:52:33+00:00\",\"dateModified\":\"2023-04-24T11:07:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/\"},\"wordCount\":195,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/05\\\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg\",\"articleSection\":[\"Blog Feed - Nordics\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/\",\"name\":\"Norway: First turbine installed on \u00d8yfjellet - Nordex SE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/05\\\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg\",\"datePublished\":\"2021-05-31T13:52:33+00:00\",\"dateModified\":\"2023-04-24T11:07:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/05\\\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2021\\\/05\\\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg\",\"width\":1920,\"height\":1078},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/2021\\\/05\\\/norway-first-turbine-installed-on-oyfjellet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Norway: First turbine installed on \u00d8yfjellet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"name\":\"Nordex SE\",\"description\":\"Manufacture, installation and maintenance of wind turbines.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#organization\",\"name\":\"Nordex SE\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.nordex-online.com\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2024\\\/11\\\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png\",\"width\":1181,\"height\":353,\"caption\":\"Nordex SE\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/#\\\/schema\\\/person\\\/ad1c876aa5735832f07a9659e6f81399\",\"name\":\"Liljenberg, Robin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g\",\"caption\":\"Liljenberg, Robin\"},\"url\":\"https:\\\/\\\/www.nordex-online.com\\\/en\\\/author\\\/rliljenberg\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Norway: First turbine installed on \u00d8yfjellet - Nordex SE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/","og_locale":"en_US","og_type":"article","og_title":"Norway: First turbine installed on \u00d8yfjellet","og_description":"On the 22nd of May, Nordex Group\u2019s Project Management team reached a major milestone on one of the company\u2019s biggest projects in the Nordic region, when the first wind turbine was installed on \u00d8yfjellet wind farm in Norway. This success is thanks to a committed local team who has been working hard despite difficult site...    Read more","og_url":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/","og_site_name":"Nordex SE","article_published_time":"2021-05-31T13:52:33+00:00","article_modified_time":"2023-04-24T11:07:18+00:00","og_image":[{"width":1920,"height":1078,"url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg","type":"image\/jpeg"}],"author":"Liljenberg, Robin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Liljenberg, Robin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#article","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/"},"author":{"name":"Liljenberg, Robin","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/ad1c876aa5735832f07a9659e6f81399"},"headline":"Norway: First turbine installed on \u00d8yfjellet","datePublished":"2021-05-31T13:52:33+00:00","dateModified":"2023-04-24T11:07:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/"},"wordCount":195,"publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg","articleSection":["Blog Feed - Nordics"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/","url":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/","name":"Norway: First turbine installed on \u00d8yfjellet - Nordex SE","isPartOf":{"@id":"https:\/\/www.nordex-online.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#primaryimage"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg","datePublished":"2021-05-31T13:52:33+00:00","dateModified":"2023-04-24T11:07:18+00:00","breadcrumb":{"@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#primaryimage","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2021\/05\/WhatsApp-Image-2021-05-26-at-18.23.53.jpeg","width":1920,"height":1078},{"@type":"BreadcrumbList","@id":"https:\/\/www.nordex-online.com\/en\/2021\/05\/norway-first-turbine-installed-on-oyfjellet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nordex-online.com\/en\/"},{"@type":"ListItem","position":2,"name":"Norway: First turbine installed on \u00d8yfjellet"}]},{"@type":"WebSite","@id":"https:\/\/www.nordex-online.com\/en\/#website","url":"https:\/\/www.nordex-online.com\/en\/","name":"Nordex SE","description":"Manufacture, installation and maintenance of wind turbines.","publisher":{"@id":"https:\/\/www.nordex-online.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nordex-online.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nordex-online.com\/en\/#organization","name":"Nordex SE","url":"https:\/\/www.nordex-online.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","contentUrl":"https:\/\/www.nordex-online.com\/wp-content\/uploads\/sites\/2\/2024\/11\/cropped-cropped-Combined_Logos_cmyk_PNG1-1.png","width":1181,"height":353,"caption":"Nordex SE"},"image":{"@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nordex-online.com\/en\/#\/schema\/person\/ad1c876aa5735832f07a9659e6f81399","name":"Liljenberg, Robin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e7c3a6d97bd0ecc2fba10d560657b91a84807cb727a9c57185b815f7312f049b?s=96&d=mm&r=g","caption":"Liljenberg, Robin"},"url":"https:\/\/www.nordex-online.com\/en\/author\/rliljenberg\/"}]}},"_links":{"self":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/11729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/comments?post=11729"}],"version-history":[{"count":2,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/11729\/revisions"}],"predecessor-version":[{"id":11905,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/posts\/11729\/revisions\/11905"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media\/11730"}],"wp:attachment":[{"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/media?parent=11729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/categories?post=11729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nordex-online.com\/en\/wp-json\/wp\/v2\/tags?post=11729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}