Deutsch | Français | Italiano | Downloads | Contact
 
 
04.06.2012, Press release

Nordex delivering 19 multi-megawatt turbines to Turkey

Hamburg, 4 June 2012. Nordex had been awarded a contract for the assembly of a 47.5 MW wind farm in Turkey. It is now working on the “Canta RES” project, which comprises 19 N100/2500 turbines, for Boydak Holding.

 

“Canta RES” is located to the east of the town of Çorlu in the Trakya region in Western Turkey. Thanks to the proximity of the wind farm to the Marmara Sea, mean annual wind speeds are between 7.5 and 8.5 metres per second. With a rotor diameter of one hundred metres and a hub height also of one hundred metres, these turbines, which are specially configured for this wind class, can produce 185 gigawatt/hours of clean energy per year. The wind farm is to be handed over to the customer this year.

 

Boydak Holding is a leading industrial conglomerate in Turkey with activities in the furniture industry, home textiles, telecommunications and energy, amongst other things. In the energy segment, it wants to increasingly operate hydro and wind power plants in Turkey and establish a local wind power capacity of up to 400 MW in the medium term.


Contact: Ralf Peters Felix Losada
Bereich: Public Relations /Investor Relations Public Relations / Marketing
Tel.: ++49 - 40 - 300 30 -1000 ++49 - 40 - 300 30 -1000
Fax: ++49 - 40 - 300 30 -1101 ++49 - 40 - 300 30 -1101
E-Mail: rpeters(at)nordex-online.com flosada(at)nordex-online.com

 
© 2013 Nordex SE, Hamburg - Germany                     Sitemap | Imprint