Nordex N90 (2.5 Megawatt)Practical experience gained from hundreds of turbines in the N80/2500 kW and N90/2300 kW turbine family installed worldwide contributed to the design of this 2.5 MW machine with its 90-metre rotor.
The guaranteed power curve, the independently measured noise properties, network compatibility comparable to that of the N90/2300 kW and the test findings obtained by independent experts on a Danish wind field confirm the high efficiency ratio of the turbine. The N90/2500 kW is the most efficient wind energy system in the Nordex product family.
The high-speed and low-speed versions of the turbine take optimal advantage of both strong and light winds.
Technical Highlights
Low-wear rotor brake
Maintenance-friendly machine housing
Powerful yawing
Automatic lubrication
OptionsOur customers have several options to choose from. The N90/2500 is designed for locations with strong winds and locations with light winds in the HS (high-speed) and LS (low-speed) versions. We supply the turbine as a 50 or 60 Hz version, depending on the country where the wind park is to be connected to the grid. The HS version of the N90/2500 kW can also be employed offshore.
Electrical featuresThe electrical features of the N90/2500 kW fulfill the E.ON grid-connection rules (Version 8/03) and further international codes will be available shortly. The turbine is certified in accordance with DIBt 2 and DIBt 3, as well as IEC 1b, IEC 2a and IEC 3a.
RotorbladesIn our state-of-the-art manufacturing facility in Rostock, built in 2001, we manufacture some of our rotor blade requirements in 12,000 square metres of factory space. The rotor blades NR45 (N90) are built using the vacuum injection method This method involves placing the glass fiber in a vacuum so that the structures can absorb the resin. As a result, consistently high product quality is ensured and on-site safety enhanced. In addition, Nordex is employing a new coating method which has proven to be highly weather-resistant in practice.
Operations managementThe N90/2500 is controlled by Nordex Control 2 (NC2), a software/hardware system for managing the central wind power system components right up to wind farms or the power station networks of non-centralized energy producers. The software system continuously evaluates all operating and weather data measured and ensures yield-optimized operation of the system. To this end, Nordex programs each system with turbine and location-based parameters. The wind turbines are fitted with two devices (anemometer) to record wind data. The first one is used to manage the system and the second one monitors the first device. If one device fails, the other takes over.
Each system is linked to a remote monitoring system for controlling the components (hardware and software). In this way, all data and signals are transmitted by ISDN and can be viewed using an Internet browser. This ensures data monitoring as well as active remote management (e.g. start-up, deactivation and wind tracking) for each turbine from the Nordex service center in Rostock. The remote monitoring office works around the clock and is automatically alerted in the event of any deviation in operating data from standard parameters. The system is backed by an emergency power supply. Together with the batteries fitted to the pitch system, the system is deactivated securely in the event of any loss of power.
In addition, the turbine can be fitted with a condition monitoring system to ensure proactive maintenance. This early warning system alerts the operator when a component needs to be replaced in the foreseeable future. In this way, it is possible to avoid an unscheduled shutdown.
Download Nordex Control 2 brochure (PDF).
Case StudiesYou can download the following case studies (PDF). Gotsu, Japan (20,7 MW) Huds Moar, Sweden (15 MW) Knockawarriga, Ireland (22,5 MW) Wing River, USA (2,5 MW, 60-Hz-Version) Yuntdag, Turkey (42,5 MW) |
|||||||||||||
![]() |
|
|
|
||||||||||
![]() |
|